31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

. Distribution:1) One copy furnished Resident Project Representative.2) One copy retained in Engineer’s file.3) Remaining copies returned to Contractor appropriatelyannotated.1.04 INFORMATIONAL SUBMITTALSA. General:1. Copies: Submit three copies, unless otherwise indicated in individualspecification section.2. Refer to individual specification sections for specific submittalrequirements.3. Engineer will review each submittal. If submittal meets conditions of theContract, Engineer will forward copy to appropriate parties. If Engineerdetermines submittal does not meet conditions of the Contract and istherefore considered unacceptable, Engineer will retain one copy andreturn remaining copy with review comments to Contractor, and requirethat submittal be corrected and resubmitted.B. Certificates:1. General:a. Provide notarized statement that includes signature of entityresponsible for preparing certification.b. Signed by officer or other individual authorized to sign documentson behalf of that entity.2. Welding: In accordance with individual specification sections.3. Installer: Prepare written statements on manufacturer’s letterheadcertifying installer complies with requirements as specified in individualspecification section.4. Material Test: Prepared by qualified testing agency, on testing agency’sstandard form, indicating and interpreting test results of material forcompliance with requirements.5. Certificates of Successful Testing or Inspection: Submit when testing orinspection is required by Laws and Regulations or governing agency orspecified in individual specification sections.6. Manufacturer’s Certificate of Compliance: In accordance withSection 01 43 33, Manufacturers’ Field Services.7. Manufacturer’s Certificate of Proper Installation: In accordance withSection 01 43 33, Manufacturers’ Field Services.C. <strong>Construction</strong> Photographs: In accordance with Section 01 31 13, ProjectCoordination, and as may otherwise be required in Contract Documents.PW/WBG/382059SUBMITTAL PROCEDURESAUGUST 15, 2012 01 33 00 - 5©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!