31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.04 MANUFACTURER’S SERVICESA. Provide manufacturer’s representative at Site for preinstallation meeting,installation assistance, inspection and certification of proper installation, andperformance testing of specified equipment.3.05 CLEANINGA. After erection, protect exposed portions from damage by machines, plaster,lime, paint, acid, cement, or other harmful compounds.B. Remove protective materials and clean with plain water, water with soap, orhousehold detergent.3.06 PROTECTIONA. Protect adjacent areas and finish surfaces from damage during productinstallation.3.07 SCHEDULESA. For tabulation of door and frame characteristics, such as size, type, detail, andfinish hardware requirements, see Section 08 06 01, Door and HardwareSchedules.END OF SECTIONALUMINUM-FRAMED ENTRANCESPW/WBG/382059AND STOREFRONTS AUGUST 15, 201208 41 13 - 6 ©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!