1. Preparatory Phase:a. Notify Owner at least 48 hours in advance of beginning any of therequired action of the preparatory phase.b. This phase shall include a meeting conducted by the CQC SystemManager and attended by the superintendent, other CQCpersonnel (as applicable), and the foreman responsible for thedefinable feature. The CQC System Manager shall instructapplicable CQC staff as to the acceptable level of workmanshiprequired in order to meet Contract requirements.c. Document the results of the preparatory phase meeting by separateminutes prepared by the CQC System Manager and attached tothe QC report.d. Perform prior to beginning Work on each definable feature ofWork:1) Review applicable Contract Specifications.2) Review applicable Contract Drawings.3) Verify that all materials and/or equipment have been tested,submitted, and approved.4) Verify that provisions have been made to provide requiredcontrol inspection and testing.5) Examine the Work area to verify that all requiredpreliminary Work has been completed and is in compliancewith the Contract.6) Perform a physical examination of required materials,equipment, and sample Work to verify that they are onhand, conform to approved Shop Drawing or submitteddata, and are properly stored.7) Review the appropriate activity hazard analysis to verifysafety requirements are met.8) Review procedures for constructing the Work, includingrepetitive deficiencies.9) Document construction tolerances and workmanshipstandards for that phase of the Work.10) Check to verify that the plan for the Work to be performed,if so required, has been accepted by Engineer.2. Initial Phase:a. Accomplish at the beginning of a definable feature of Work:1) Notify Owner at least 48 hours in advance of beginning theinitial phase.2) Perform prior to beginning Work on each definable featureof Work:a) Review minutes of the preparatory meeting.b) Check preliminary Work to verify compliance withContract requirements.c) Verify required control inspection and testing.CONTRACTOR QUALITY CONTROLPW/WBG/38205901 45 16.13 - 4 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!