31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B. Preinstallation Training: Manufacturer-approved training of applicationpersonnel and quality control inspectors for these floor finishes.C. Conference Prior to Slab Placement:1. Conducted by Contractor.2. Agenda:a. Concrete mix design.b. Placing techniques.c. Finishing techniques.d. Floor hardener application procedures.e. Equipment required for these procedures.3. Attendees:a. Contractor’s superintendent.b. Subcontractor’s representative involved in slab installation andfinishing.c. Engineer.D. Mockups: Install one 10-foot by 20-foot area for each type of finish floor todemonstrate that the material and methods produce a finished productacceptable to the Engineer.1. Mockup will establish the standard of quality for floor finishes.2. Use specified materials at a location designated by Engineer or Owner.3. Notify Engineer 5 days in advance of commencement of mockup floorslab application and training.4. Do not purchase floor materials until mockup slab installation has beenaccepted by the Engineer or Owner.E. Color Samples: Minimum 2-inch by 2-inch Sample applications of floorfinishes available.PART 2PRODUCTS2.01 CLEAR LIQUID SEALER DUST PROOFERA. Colorless, aqueous solution of zinc and magnesium fluorosilicate.B. Each gallon of solution shall contain a minimum of 2 pounds of fluorosilicatecompound.C. Manufacturers:1. L&M <strong>Construction</strong> Chemicals, Omaha, NE.2. Master Builders Co., Cleveland, OH.CONCRETE FINISHINGPW/WBG/38205903 35 00 - 2 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!