8. Notify property owners and utility offices that may be affected byconstruction operation at least 2 days in advance: Before exposing autility, obtain utility owner’s permission. Should service of utility beinterrupted due to Contractor’s operation, notify proper authorityimmediately. Cooperate with said authority in restoring service aspromptly as possible and bear costs incurred.9. Do not impair operation of existing sewer system. Prevent constructionmaterial, pavement, concrete, earth, volatile and corrosive wastes, andother debris from entering sewers, pump stations, or other sewerstructures.10. Maintain original Site drainage wherever possible.B. Barricades and Lights:1. Provide as required to safeguard public and the Work.2. Provide as necessary to prevent unauthorized entry to construction areasand affected roads, streets, and alleyways, inside and outside of fencedarea, and as required to ensure public safety and the safety ofContractor’s employees, other employer’s employees, and others whomay be affected by the Work.3. Provide to protect existing facilities and adjacent properties frompotential damage.4. Locate to enable access by facility operators and property owners.5. Protect streets, roads, highways, and other public thoroughfares that areclosed to traffic by effective barricades with acceptable warning signs.6. Locate barricades at the nearest intersecting public thoroughfare on eachside of blocked section.7. Illuminate barricades and obstructions with warning lights from sunsetto sunrise.C. Trees and Plantings: Protect from damage and preserve trees, shrubs, andother plants outside limits of the Work and within limits of the Work, whichare designated on Drawings to remain undisturbed.D. Existing Structures:1. Where Contractor contemplates removal of small structures thatinterfere with Contractor’s operations, obtain approval of Engineer.2. Replace items removed in their original location and a condition equalto or better than original.E. Finished <strong>Construction</strong>: Protect finished floors and concrete floors exposed aswell as those covered with composition tile or other applied surfacing.PW/WBG/382059TEMPORARY FACILITIES AND CONTROLSAUGUST 15, 2012 01 50 00 - 7©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!