31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.03 MANUFACTURER’S CERTIFICATE OF PROPER INSTALLATIONA. When so specified, a Manufacturer’s Certificate of Proper Installation form, acopy of which is attached to this section, shall be completed and signed byequipment manufacturer’s representative.B. Such form shall certify signing party is a duly authorized representative ofmanufacturer, is empowered by manufacturer to inspect, approve, and operatetheir equipment and is authorized to make recommendations required toensure equipment is complete and operational.3.04 TRAININGA. General:1. Furnish manufacturers’ representatives for detailed classroom andhands-on training to Owner’s personnel on operation and maintenanceof specified product (system, subsystem, component) and as may berequired in applicable Specifications.2. Furnish trained, articulate personnel to coordinate and expedite training,to be present during training coordination meetings with Owner, andfamiliar with operation and maintenance manual information specifiedin Section 01 78 23, Operation and Maintenance Data.3. Manufacturer’s representative shall be familiar with facility operationand maintenance requirements as well as with specified equipment.4. Furnish complete training materials, to include operation andmaintenance data, to be retained by each trainee.B. Training Schedule:1. List specified equipment and systems that require training services andshow:a. Respective manufacturer.b. Estimated dates for installation completion.c. Estimated training dates.2. Allow for multiple sessions when several shifts are involved.3. Adjust schedule to ensure training of appropriate personnel as deemednecessary by Owner, and to allow full participation by manufacturers’representatives. Adjust schedule for interruptions in operability ofequipment.4. Coordinate with Section 01 32 00, <strong>Construction</strong> ProgressDocumentation, and Section 01 91 14, Equipment Testing and FacilityStartup.C. Lesson Plan: When manufacturer or vendor training of Owner personnel isspecified, prepare a lesson plan for each required course containing thefollowing minimum information:PW/WBG/382059MANUFACTURERS’ FIELD SERVICESAUGUST 15, 2012 01 43 33 - 3©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!