4. Identify each activity with a unique number and a brief description ofthe Work associated with that activity.5. Indicate the critical path.6. Show, at a minimum, the controlling relationships between activities.7. Plot activities on a time-scaled basis, with the length of each activityproportional to the current estimate of the duration.8. Plot activities on an early start basis unless otherwise requested byEngineer.9. Provide a legend to describe standard and special symbols used.D. Schedule Report:1. On 8-1/2-inch by 11-inch white paper, unless otherwise approved.2. List information for each activity in tabular format, including at aminimum:a. Activity Identification Number.b. Activity Description.c. Original Duration.d. Remaining Duration.e. Early Start Date (Actual start on Updated Progress Schedules).f. Early Finish Date (Actual finish on Updated Progress Schedules).g. Late Start Date.h. Late Finish Date.i. Total Float.3. Sort reports, in ascending order, as listed below:a. Activity number sequence with predecessor and successoractivity.1.05 PROGRESS OF THE WORKA. Updated Progress Schedule shall reflect:1. Progress of Work to within 5 working days prior to submission.2. Approved changes in Work scope and activities modified sincesubmission.3. Delays in Submittals or resubmittals, deliveries, or Work.4. Adjusted or modified sequences of Work.5. Other identifiable changes.6. Revised projections of progress and completion.7. Report of changed logic.B. Produce detailed subschedules during Project, upon request of Owner orEngineer, to further define critical portions of the Work such as facilityshutdowns.C. If Contractor fails to complete activity by its latest scheduled completion dateand this Failure is anticipated to extend Contract Times (or Milestones),CONSTRUCTION PROGRESSPW/WBG/382059DOCUMENTATION AUGUST 15, 201201 32 00 - 4 ©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!