PART 3EXECUTION3.01 INSTALLATIONA. Install where indicated or directed and following manufacturer’srecommendations.1. Verify fire extinguishers and signage locations with authority havingjurisdiction.B. Secure brackets rigidly to structure.C. Place extinguishers on wall brackets.D. Top of Extinguisher: No more than 54 inches above floor.END OF SECTIONPW/WBG/382059PORTABLE FIRE ANDAUGUST 15, 2012SAFETY EQUIPMENT©COPYRIGHT 2012 CH2M HILL 10 44 00 - 3