31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B. Lubrication System:1. Require no more than weekly attention during continuous operation.2. Convenient and accessible; oil drains with bronze or stainless steelvalves and fill-plugs easily accessible from the normal operating area orplatform. Locate drains to allow convenient collection of oil during oilchanges without removing equipment from its installed position.3. Provide constant-level oilers or oil level indicators for oil lubricationsystems.4. For grease type bearings, which are not easily accessible, provide andinstall stainless steel tubing; protect and extend tubing to convenientlocation with suitable grease fitting.2.03 SOURCE QUALITY CONTROLA. Where Specifications call for factory testing to be witnessed by Engineer,notify Engineer not less than 14 days prior to scheduled test date, unlessotherwise specified.B. Calibration Instruments: Bear the seal of a reputable laboratory certifyinginstrument has been calibrated within the previous 12 months to a standardendorsed by the National Institute of Standards and Technology (NIST).C. Factory Tests: Perform in accordance with accepted test procedures anddocument successful completion.PART 3EXECUTION3.01 INSPECTIONA. Inspect materials and equipment for signs of pitting, rust decay, or otherdeleterious effects of storage. Do not install material or equipment showingsuch effects. Remove damaged material or equipment from the Site andexpedite delivery of identical new material or equipment. Delays to the Workresulting from material or equipment damage that necessitates procurement ofnew products will be considered delays within Contractor’s control.3.02 INSTALLATIONA. Equipment Drawings show general locations of equipment, devices, andraceway, unless specifically dimensioned.B. No shimming between machined surfaces is allowed.C. Install the Work in accordance with NECA Standard of Installation, unlessotherwise specified.COMMON PRODUCT REQUIREMENTSPW/WBG/38205901 61 00 - 6 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!