31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 01 45 16.13CONTRACTOR QUALITY CONTROLPART 1GENERAL1.01 REFERENCESA. The following is a list of standards which may be referenced in this Section:1.02 DEFINITIONS1. ASTM International (ASTM):a. D3740, Evaluation of Agencies Engaged in the Testing and/orInspection of Soil and Rock as Used in Engineering Design and<strong>Construction</strong>.b. E329, Use in the Evaluation of Testing and Inspection Agenciesas Used in <strong>Construction</strong>.A. Contractor Quality Control (CQC): The means by which Contractor ensuresthat the construction, to include that performed by subcontractors andsuppliers, complies with the requirements of the Contract.1.03 SUBMITTALSA. Informational Submittals:1. CQC Plan: Submit, not later than 30 days after receipt of Notice toProceed.2. CQC Report: Submit, weekly, an original and one copy in report form.1.04 OWNER’S QUALITY ASSURANCEA. All Work is subject to Owner’s quality assurance inspection and testing at alllocations and at all reasonable times before acceptance to ensure strictcompliance with the terms of the Contract Documents.B. Owner’s quality assurance inspections and tests are for the sole benefit ofOwner and do not:1. Relieve Contractor of responsibility for providing adequate qualitycontrol measures;2. Relieve Contractor of responsibility for damage to or loss of thematerial before acceptance;3. Constitute or imply acceptance; or4. Affect the continuing rights of Owner after acceptance of the completedWork.PW/WBG/382059CONTRACTOR QUALITY CONTROLAUGUST 15, 2012 01 45 16.13 - 1©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!