31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Ensure that structural elements are not overloaded as a result of orduring performance of the Work. Responsibility for additional structuralelements or increasing the strength of existing structural elements asmay be required as a result of any Work performed under this Contractshall be that of the Contractor. Repairs, reinforcement, or structuralreplacement must have Engineer approval.5. Do not overload pavements to remain.E. Weather Protection: For portions of the building scheduled to remain, protectbuilding interior and materials and equipment from weather at all times.Where removal of existing roofing is necessary to accomplish the Work, havematerials and workmen ready to provide adequate and temporary covering ofexposed areas so as to ensure effectiveness and to prevent loss.F. Trees: Protect trees within the Site that might be damaged during demolitionand are indicated to be left in place, by a 6-foot-high fence. The fence shall besecurely erected a minimum of 5 feet from the trunk of individual trees orfollow the outer perimeter of branches or clumps of trees. Any tree designatedto remain that is damaged during the Work shall be replaced in kind, asapproved by the Engineer.G. Facilities:1. Protect electrical and mechanical services and utilities. Where removalof existing utilities and pavement is specified or indicated, provideapproved barricades, temporary covering of exposed areas, andtemporary services or connections for electrical and mechanical utilities.2. Floors, roofs, walls, columns, pilasters, and other structural elementsthat are designed and constructed to stand without lateral support orshoring, and are determined by Contractor to be in stable condition,shall remain standing without additional bracing, shoring, or lateralsupport until demolished, unless directed otherwise by the Engineer.3. Protect all facility elements not scheduled for demolition.4. Provide interior shoring, bracing, or support to prevent movement,settlement, or collapse of structure or element to be demolished andadjacent facilities.H. Protection of Personnel:1. During demolition, continuously evaluate the condition of the structurebeing demolished and take immediate action to protect all personnelworking in and around the demolition site.2. Provide temporary barricades and other forms of protection to protectOwner’s personnel and the general public from injury due to demolitionWork.PW/WBG/382059DEMOLITIONAUGUST 15, 2012 02 41 00 - 7©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!