1.02 SUBMITTALSA. Action Submittals:1. Shop Drawings:a. Information illustrating horizontal joint reinforcement andpreformed control joint materials proposed.b. Grout proportions.c. Mortar proportions.d. Letter of certification stating grout aggregates and mortar sandmeet requirements of ASTM C33, including nonreactivity.2. Samples:a. One of each type of masonry unit to be used on Project.b. Two each; brick units for verification of color and texture tomatch existing.c. Mortar colors for color selection.B. Informational Submittals:1. Method of placing grout.2. Certified field test results within 5 days of performing specified tests.3. Letter of certification from masonry unit manufacturer stating that unitscomply with IBC Table 2105.2.2.1.2.4. Letter from water repellent admixture manufacturer verifying masonryunit manufacturer’s proper use of product.5. Certified test reports showing compliance with specified performancetests.6. Statement of acknowledgement of Quality Assurance Plan inaccordance with IBC Section 1705.3.7. Method and materials for removal of efflorescence.1.03 QUALITY ASSURANCEA. Masonry Unit Manufacturer: Qualified by manufacturer of water repellentadmixture to use product.B. Mockups:1. Lay up Sample panel for each type of masonry at Site.2. Dimensions: Minimum 4 feet high by 4 feet long.3. Leave intact after approval until acceptance of permanent masonry workand then remove.4. Approved panels shall serve as basis of color, texture, bond, quality offinished joints, and for acceptance of permanent construction.CONCRETE UNIT MASONRYPW/WBG/38205904 22 00 - 2 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!