31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B. Storage:1. Store products in a protected area that is heated or cooled to maintaintemperatures within the range recommended by paint manufacturer.2. Primed surfaces shall not be exposed to weather for more than 2 monthsbefore being topcoated, or less time if recommended by coatingmanufacturer.1.06 PROJECT CONDITIONSA. Environmental Requirements:1. Do not apply paint in temperatures or moisture conditions outside ofmanufacturer’s recommended maximum or minimum allowable.2. Do not perform final abrasive blast cleaning whenever relative humidityexceeds 85 percent, or whenever surface temperature is less than5 degrees F above dew point of ambient air.PART 2PRODUCTS2.01 MANUFACTURERSA. Nationally recognized manufacturers of paints and protective coatings who areregularly engaged in the production of such materials for essentially identicalservice conditions.B. Minimum of 5 years’ verifiable experience in manufacture of specifiedproduct.C. Each of the following manufacturers is capable of supplying most of theproducts specified herein:1. Carboline Coatings.2. Induron Protective Coatings.3. PPG Industries.4. Tnemec Company, Inc.2.02 ABRASIVE MATERIALSA. Select abrasive type and size to produce surface profile that meets coatingmanufacturer’s recommendations for specific primer and coating system to beapplied.PAINTING AND COATINGPW/WBG/38205909 90 00 - 4 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!