31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART 3EXECUTION3.01 INSTALLATIONA. In accordance with manufacturer’s written instructions.B. Make Work neat and secure, develop full strength of components, and provideproper function.C. Prevent marring, scratching, or otherwise damaging adjacent finishes duringhardware installation.D. Latchbolts:1. Install to engage in strikes automatically, whether activated by closers ormanually.2. In no case shall additional manual pressure be required to engagelatchbolt in strike.E. Stops and Holders: Set to allow doors to open as far as possible.F. Wall Mounted Hardware: Install over solid structural backing or solidblocking in hollow walls.G. Thresholds:1. Cope ends neatly to profile of jamb.2. Set in sealant and seal ends to jambs.H. Key Control System Cabinet: Install where shown.I. Hardware: Adjust for easy, noise-free operation.J. Replace damaged hardware items.3.02 MOUNTING DIMENSIONSA. Standard Door Hardware Locations: As recommended and published by Doorand Hardware Institute, except as noted or detailed otherwise.B. Door Silencers: Install 3 inches from top and bottom of jamb and 1 inch abovestrike at single doors, and 3 inches from edges of doors in head for pairs ofdoors.DOOR HARDWAREPW/WBG/38205908 71 00 - 8 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!