Japan & Export-Import Bank <strong>of</strong> Japan etc. have also financed POWERGRID projects<br />

and have shown keen interest in financing its new projects.<br />

Till March 31, 1<strong>99</strong>7 POWERGRID has successfully raised Rs.1250 crore (including<br />

Rs.214 crore tax free bonds) by issuing <strong>Power</strong> Bonds. During <strong>1<strong>99</strong>8</strong>-<strong>99</strong> <strong>Power</strong>grid will<br />

be expected to raise Bonds worth <strong>of</strong> Rs 500 crore.<br />

11.5.4 MOU <strong>PERFORMANCE</strong><br />

Based on the results <strong>of</strong> performance for the year 1<strong>99</strong>6-97, POWERGRID is again poised<br />

to achieve “Excellent Performance” rating as per its MOU with <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong>,<br />

consecutively for the 4th year in a row.<br />

11.5.5 OPERATIONAL <strong>PERFORMANCE</strong><br />

As on March 31, 1<strong>99</strong>7, POWERGRID operates a total <strong>of</strong> 27,853 CKMs. transmission<br />

lines consisting <strong>of</strong> 19,973 CKMs <strong>of</strong> 400 KV, 5,125 CKMs <strong>of</strong> 220 KV, 1,125 CKMs <strong>of</strong><br />

132 KV and 1,630 CKMs <strong>of</strong> HVDC system distributed over 54 sub-stations with 23,331<br />

MVA <strong>of</strong> transformation capacity. The operational performance <strong>of</strong> POWERGRID<br />

transmission system has been impressive in all the five power regions. Overall average<br />

availability <strong>of</strong> transmission lines during the year was <strong>99</strong>.48% which is comparable<br />

with best international standards.<br />

11.5.6 CONSTRUCTION <strong>PERFORMANCE</strong><br />

Since incorporation, till the end <strong>of</strong> 1<strong>99</strong>7-98 POWERGRID has added more than 17,000<br />

ckt kms. <strong>of</strong> transmission net work. during 1<strong>99</strong>7-98 POWERGRID has commissioned<br />

3,150 ckm <strong>of</strong> transmission lines and 630 MVA <strong>of</strong> Transformer capacity.<br />

Presently, about 12,700 ckt. kms. <strong>of</strong> transmission lines with voltage levels varying<br />

from 132 KV to 800 KV and 39 substations including bays, are under construction<br />

which are expected to be completed progressively in the coming years to match with<br />

the commissioning <strong>of</strong> generation projects.<br />

11.5.7 FINANCIAL <strong>PERFORMANCE</strong><br />

During the year 1<strong>99</strong>6-97 <strong>Power</strong>grid Corporation has earned a net pr<strong>of</strong>it <strong>of</strong> Rs. 305.75<br />

crores against a total Turn Over <strong>of</strong> Rs.1058 crores and during 1<strong>99</strong>7-98 pr<strong>of</strong>it <strong>of</strong> the<br />

corporation (provisional) Rs.360.51 crores against turn over <strong>of</strong> Rs.1390.62 crores.<br />

<strong>99</strong>