utilised for financing rehabilitation <strong>of</strong> existing <strong>Power</strong> Plants and distribution systems. The PFC<br />

has disbursed Rs. 44.53 crores till March, <strong>1<strong>99</strong>8</strong>.<br />

11.4.8 ACCEI ERATED POWER GENERATION AND SUPPLY PROGRAMME.<br />

Realising that the growth in generation capacity and associated transmission links has<br />

not kept pace with the growth in demand for power, during the 8th Plan, as well as the<br />

anticipation <strong>of</strong> a large gap during the first 3 years <strong>of</strong> the 9th Plan, priority is being given<br />

to funding On-Going Projects, which have been languishing for want <strong>of</strong> funds for their<br />

completion, to R&M Projects, Life Extension Programmes, System improvement and<br />

Missing Transmission Links which are expected to enhance power availability and<br />

supply and partially bridge the demand-supply gap in the short-term, Government <strong>of</strong><br />

India has decided to provide interest subsidy <strong>of</strong> 4% throughout the life <strong>of</strong> the loan for<br />

disbursements made during 1<strong>99</strong>7-98.<br />

Salient features <strong>of</strong> this scheme are as follows:<br />

- Interest subsidy upto Rs.200 crore would be provided by the GOI through budget.<br />

- Should be utilised during the year 1<strong>99</strong>7-98<br />

- Budget grants would be utilised to provide interest subsidy over the total repayment<br />

period.<br />

- PFC lending at 4% below normal rates for eligible projects.<br />

Projects/Schemes eligible under the scheme:<br />

- On-Going generation projects (both thermal and hydro) which are expected to be<br />

commissioned by end <strong>of</strong> March,2000.<br />

- R & M, Life Extension and Refurbishment Schemes/Projects (both thermal and<br />

hydro).<br />

- Missing transmission links required for existing generation capacity or for the<br />

generation projects expected to be completed by March 2000.<br />

- All Capacitors, Meters installation schemes requiring disbursements during<br />

1<strong>99</strong>7-98,<br />

- Schemes likely to yield improved PLF/Generation within a short span <strong>of</strong> 6-12<br />

months.<br />

- Mini and micro hydel schemes which could be commissioned by March, 2000.<br />

Interest subsidy would be proportionately reduced if there is delay in commissioning<br />

<strong>of</strong> generation projects/ evacuation schemes in relation to the target dates.<br />