PERFORMANCE BUDGET 1998-99 - Ministry of Power

PERFORMANCE BUDGET 1998-99 - Ministry of Power

PERFORMANCE BUDGET 1998-99 - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The deails <strong>of</strong> receips and expenditure are as under:<br />

63<br />

(Rs. in lakhs)<br />

a) Receipts:<br />

i) Actual amount to be realised during 1<strong>99</strong>7-98 : 231.54<br />

ii) Actual amount realised during the 1<strong>99</strong>7-98 : 231.02<br />

iii) Targeted receipts during the year <strong>1<strong>99</strong>8</strong>-<strong>99</strong> : 212.00<br />

b) Expenditure:<br />

Plan Non-Plan Total<br />

Actual expenditure during 1<strong>99</strong>6-97 2156.00 265.00 2421.00<br />

Budget Estimates 1<strong>99</strong>7-98 1186.00 250.00 1436.00<br />

Revised Estimates 1<strong>99</strong>7-98 892.00 367.00 1259.00<br />

Actual Expenditure during 576.00 367.00 943.00<br />

Budget Estimates <strong>1<strong>99</strong>8</strong>-<strong>99</strong> 902.00 350.00 1252.00<br />

8.2 HOT LINE TRAINING CNTRE (HLTC), BANGALORE:<br />

8.2.1 To meet the need for adopting safe and secure maintenance method for transmission lines and<br />

sub-stations with the least interruption <strong>of</strong> power supply, training <strong>of</strong> personnel in specialised<br />

techniques <strong>of</strong> hot line maintenances, using hot line tools and bare hand techniques has been<br />

considered necessary. To meet this requirement, the Hot Line Training Centre was set up to<br />

impart quality training to personnel from Electricity Boards and Electricity Supply Undertaking<br />

all over the Country on live line techniques <strong>of</strong> maintenance <strong>of</strong> <strong>Power</strong> Transmision lines (Popularly<br />

known as Hot Line Maintenance Techniques). The stage-I scheme was complted in the year<br />

1981 by way <strong>of</strong> procurement <strong>of</strong> tools and equipments and regular training course upto 220<br />

KV level Hot Stick Method are being conducted since then.<br />

The Centre is equipped to train 45 personnel per year. Due to the construction <strong>of</strong> number <strong>of</strong><br />

400 KV lines it was felt neccessary to augement the training facilities and to introduce training<br />

upto 400 KV lines by setting the Centre on a permanent basis. Towards this the revised cost<br />

estimates <strong>of</strong> stage_II <strong>of</strong> the scheme was approved by <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> in Dec., 1<strong>99</strong>7 at a<br />

cost <strong>of</strong> Rs.865 lakh. This include construction <strong>of</strong> quarters, administrative building, trainees<br />

hostel and experimental lines etc.<br />

8.2.2 Scope and object <strong>of</strong> the Institure:<br />

Proper maintenance <strong>of</strong> transmission/sub-transmission lines and sub-station is essential<br />

for ensuring un-interrupted power supply to consumers. Normally, these works are<br />

carried out after taking shut-downs <strong>of</strong> the transmission lines. This results in interruption<br />

<strong>of</strong> power supply and consequent inconvenience to the consumers and also results in