Indicated below are the Transmission lines expected to be completed during <strong>1<strong>99</strong>8</strong>-<strong>99</strong>:<br />
Project name Status<br />
1. Kathalguri Transmission system 03/<strong>99</strong><br />
2. RAPP - B 03/<strong>99</strong><br />
3. Kayamkulam 03/<strong>99</strong><br />
4. Jeypore-Gajuwaka HVDC B/B & AC system 02/<strong>99</strong><br />
5. Kopili-Misa (Kopili Stage-I Extn.) 06/98<br />
6. Augmentation NER 03/<strong>99</strong><br />
7. Agartala Gas 03/<strong>99</strong><br />
8. Kaiga APP 12/98<br />
9. Neyveli-Bahoor 06/98<br />
5. CENTRAL ELECTRICITY AUTHORITY<br />
5.1 Central Electricity Authority (CEA), a statutory organisation constituted under Sec.3(1) <strong>of</strong><br />
Electricity Supply Act, 1948 has played an important role in formulating policies and<br />
programmes for power development in the country and in planning and coordinating the<br />
various development activities in the <strong>Power</strong> Sector. CEA has been carrying out detailed<br />
system planning studies with a view to identifying the generating capacity additions and<br />
transmission system requirements in the short and long time-frame. Such studies continued in<br />
the year 1<strong>99</strong>7-98. As part <strong>of</strong> its planning activities, CEA conducts detailed power surveys on<br />
a regular basis. CEA has also been carrying out close monitoring <strong>of</strong> the construction <strong>of</strong><br />
generation and transmission projects to ensure timely completion by identifying bottlenecks<br />
and problem areas and initiation <strong>of</strong> remedial measures/actions.<br />
5.2 In order to improve the performance level <strong>of</strong> power stations, CEA has been monitoring the<br />
operation <strong>of</strong> the power stations and rendering assistance in solving the operation and<br />
maintenance problems. CEA has also been laying stress on Renovation and Modernisation <strong>of</strong><br />
power stations with a view to improving their performance and extending their life cycle.<br />
CEA ensures the timely clearance <strong>of</strong> these schemes besides overall coordination and monitoring<br />
<strong>of</strong> the physical and financial progress <strong>of</strong> the schemes. Energy Audit studies for reduction <strong>of</strong><br />
secondary fuel oil consumption <strong>of</strong> selected Thermal <strong>Power</strong> Stations for improving their efficiency<br />
have also been taken up.<br />
5.3 CEA has been playing the lead role in promoting integrated operation and regional grid systems<br />
and the evolution <strong>of</strong> a National Grid. The Regional Load Despatch Centres (RLDCs) operated<br />
by CEA continued to coordinate the regional grid operations and monitor in real time the<br />
security <strong>of</strong> the Grid and delivery <strong>of</strong> shares from the Central<br />