5.1.3 The financial requirement for the above Inter-state transmission lines (Plan-charged) are as<br />

under:<br />

(Rs. in lakhs)<br />

Actual 1<strong>99</strong>6-97 B.E. 1<strong>99</strong>7-98 R.E.1<strong>99</strong>7-98 B.E. <strong>1<strong>99</strong>8</strong>-<strong>99</strong><br />

550.00 170.00 170.00 170.00<br />

5.2 REGIONAL LOAD DESPATCH CENTRES:<br />

5.2.1 With the objectives <strong>of</strong> ensuring integrated operation <strong>of</strong> Regional Grids and to derive optimal<br />

benefits from the concept <strong>of</strong> regional planning for ensuring supply <strong>of</strong> power to States from<br />

Central sector stations as per directions <strong>of</strong> the Government and for interstate transfer <strong>of</strong><br />

power during emergencies as well as under mutually agreed arrangements, the Government<br />

decided to set up Regional Load Despatching Centres under the aegis <strong>of</strong> Regional Electricity<br />

Boards (REBs). The RLDCs work in tandem with State Load Despatch Centres for safety<br />

<strong>of</strong> Grid, maintenance <strong>of</strong> Grid discipline, interstate flow <strong>of</strong> power etc. The REBs have completed<br />

the project work <strong>of</strong> RLDCs except for the small work <strong>of</strong> the staff quarters in Eastern Region.<br />

With the advent <strong>of</strong> POWERGRID, the responsibilities <strong>of</strong> day-to-day operation <strong>of</strong> Grids<br />

has been entrusted to POWERGRID. In line with this decision <strong>of</strong> Govt <strong>of</strong> India, the<br />

CEA have transferred the equipment installed under the RLDC project and day-to-day<br />

operation <strong>of</strong> the regional grid to POWERGRID. With effect from 1.1.96 the operation<br />

<strong>of</strong> all the five RLDCs is with POWERGRID.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> has decided to entrust the following functions relating to Grid<br />

management to REBs (CEA):<br />

1) Energy account on daily and monthly basis.<br />

2) Formulation <strong>of</strong> policies for safe, secure and economic operation <strong>of</strong> Regional<br />

Grids.<br />

3) Operation Planning.<br />

4) Facilitation <strong>of</strong> commercial arrangements for inter utility trading <strong>of</strong> power.<br />

5) Assistance to umpire for settlement <strong>of</strong> disputes and providing secretarial assistance<br />

to Regional Task Force.<br />

5.2.2 Regional Load Despatch Centres (Residual works)<br />

The EREB staff quarters’, which were part <strong>of</strong> the Regional Load Despatch Centres<br />

48