ii) Electro-mechanical equipment: Contracts for procurements <strong>of</strong> Main Electro-mechanical<br />

equipment and Control systems alongwith financing were signed with Consortium members<br />

viz. EME, Russia; HPI, Moscow & ABB Germany on 5th April, 1<strong>99</strong>7. Loan agreements<br />

were signed with KFW, for the ABB portion <strong>of</strong> supplies during May’97. After receipt <strong>of</strong><br />

concurrence to the Risk Sharing Agreement from Government <strong>of</strong> UP, the Sovereign Guarantee<br />

was issued by Government <strong>of</strong> India in November, 1<strong>99</strong>7. The down payments were released<br />

to the Consortium members after completion <strong>of</strong> contractual obligations by the Contractors<br />

and the contracts have come into force during the year 1<strong>99</strong>7-98.<br />

iii) Other Contracts: Contracts for Penstock Fabrication, EOT cranes, Dam Instrumentation,<br />

balance Electro-mechanic equipment & Hydro-mechanical equipment etc. are under various<br />

stages <strong>of</strong> procrssing.<br />

5.4 REHABILITATION<br />

The rehabilitation <strong>of</strong> project affected families is being implemented by THDC in two<br />

phases. The first phase, covers those effected by the construction <strong>of</strong> C<strong>of</strong>fer Dam at Tehri. In<br />

the second phase, all the remaining 2845 families affected by the main Tehri Dam would be<br />

rehabilitated.<br />

The first phase includes all the Urban families (5291) entitled as per curent policy<br />

within the cut-<strong>of</strong>f-date <strong>of</strong> 6.6.1985, and also 2064 rural families. In the second phase,<br />

remaining fully affected families, as also all the partially affected families (3<strong>99</strong>8), would<br />

get covered.<br />

For Phase-II rehabilitation programme, additional land to the extent <strong>of</strong> about 6000<br />

acres is required. Proposals for acquisition <strong>of</strong> about 800 acres <strong>of</strong> agricultural land in<br />

Dehradun and about 1700 acres in Hardwar Districts have been submitted to the State<br />

Revenue Authorities during May - Sept., 1<strong>99</strong>6 and are under process. Efforts are also<br />

being made to locate the remaining land through land identification committee<br />

constituted by Coordination Committe.<br />

STATUS OF COMMITTEE CONSTITUTED BY GOVERNMENT OF INDIA ON REHABILITATION<br />

AND ENVIRONMENT ASPECTS IN 1<strong>99</strong>6:<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> had, during September, 1<strong>99</strong>6, consituted an Expert Committee <strong>of</strong> 12<br />

members, headed by Pr<strong>of</strong>. Hanumatha Rao, Former Member, Planning Commission to<br />

examine:<br />

- the rehabilitation policy for the project and suggest modifications, if any;<br />

- the implementation <strong>of</strong> the rehabilitation package and suggest measures for rectification<br />

<strong>of</strong> lacunae in implementation, if any; and<br />

- the implementation <strong>of</strong> various conditions <strong>of</strong> environmental clearance expect that relating<br />

to safety aspects and design <strong>of</strong> the Tehri Dam and suggest<br />

123