the line. For this purpose, several sensitive and expensive equipment were transported<br />

to the site to complete the tests without interruption. All the 132 CTs and 24 PTs were<br />

tested for their accuracy. The complete testing work took about ten days. For the first<br />

time CPRI had undertaken site testing <strong>of</strong> CTs and PTs in such a large scale. Considering<br />

the huge quantum <strong>of</strong> energy generated and transmitted in electric power system, such<br />

intermittent verification <strong>of</strong> performance <strong>of</strong> Instrument transformers already installed in<br />

power stations is necessary for operating the plant more efficiently.<br />

The Institute has been meeting its non-plan expenditure through revenue generated by<br />

testing and consultancy for the last ten years and the revenue has been increasing over<br />

the years. The trend is expected to continue also during the current year. CPRI has<br />

earned a revenue <strong>of</strong> Rs.1801 lakh during 1<strong>99</strong>6-97 representing an increase <strong>of</strong> 39% over<br />

the revenue earned during 1<strong>99</strong>5-96 on account <strong>of</strong> its increased testing and consultancy<br />

services. Anticipated revenue earnings for the Institute for the year 1<strong>99</strong>7-98 is Rs.2315<br />

lakh and efforts are made to achieve the same.<br />

7.1.4 Capital project details (Achievements for the year 1<strong>99</strong>7-98 and targets for the year<br />

<strong>1<strong>99</strong>8</strong>-<strong>99</strong>)<br />

The details <strong>of</strong> the financial and physical targets for the year 1<strong>99</strong>7-98 are furnished<br />

below:<br />

i) Setting up <strong>of</strong> 2500 MVA Short Circuit Station, Bangalore<br />

Target Achievements Remarks<br />

FINANCIAL<br />

Rs.1<strong>99</strong>.81 lakhs<br />

This amount is estimated Rs.200.00 lakhs Little excess due<br />

towards the repayment <strong>of</strong> the to variation in $<br />

amount taken from the buyers exchange value.<br />

credit from French<br />

Government.<br />

Financial target for the year<br />

<strong>1<strong>99</strong>8</strong>-<strong>99</strong> Rs.176.00 lakhs -<br />

The project has -<br />

PHYSICAL TARGET been Commissioned<br />

and is Operational.<br />

53