the line. For this purpose, several sensitive and expensive equipment were transported<br />
to the site to complete the tests without interruption. All the 132 CTs and 24 PTs were<br />
tested for their accuracy. The complete testing work took about ten days. For the first<br />
time CPRI had undertaken site testing <strong>of</strong> CTs and PTs in such a large scale. Considering<br />
the huge quantum <strong>of</strong> energy generated and transmitted in electric power system, such<br />
intermittent verification <strong>of</strong> performance <strong>of</strong> Instrument transformers already installed in<br />
power stations is necessary for operating the plant more efficiently.<br />
The Institute has been meeting its non-plan expenditure through revenue generated by<br />
testing and consultancy for the last ten years and the revenue has been increasing over<br />
the years. The trend is expected to continue also during the current year. CPRI has<br />
earned a revenue <strong>of</strong> Rs.1801 lakh during 1<strong>99</strong>6-97 representing an increase <strong>of</strong> 39% over<br />
the revenue earned during 1<strong>99</strong>5-96 on account <strong>of</strong> its increased testing and consultancy<br />
services. Anticipated revenue earnings for the Institute for the year 1<strong>99</strong>7-98 is Rs.2315<br />
lakh and efforts are made to achieve the same.<br />
7.1.4 Capital project details (Achievements for the year 1<strong>99</strong>7-98 and targets for the year<br />
<strong>1<strong>99</strong>8</strong>-<strong>99</strong>)<br />
The details <strong>of</strong> the financial and physical targets for the year 1<strong>99</strong>7-98 are furnished<br />
below:<br />
i) Setting up <strong>of</strong> 2500 MVA Short Circuit Station, Bangalore<br />
Target Achievements Remarks<br />
FINANCIAL<br />
Rs.1<strong>99</strong>.81 lakhs<br />
This amount is estimated Rs.200.00 lakhs Little excess due<br />
towards the repayment <strong>of</strong> the to variation in $<br />
amount taken from the buyers exchange value.<br />
credit from French<br />
Government.<br />
Financial target for the year<br />
<strong>1<strong>99</strong>8</strong>-<strong>99</strong> Rs.176.00 lakhs -<br />
The project has -<br />
PHYSICAL TARGET been Commissioned<br />
and is Operational.<br />