PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The following external assistance is available for the project:i)<br />
Grant <strong>of</strong> UK Govt. Pound 63 million.<br />
ii) West Merchant Bank, UK Pound 59 million.<br />
iii) Credit Nationale, France - S<strong>of</strong>t loan - FF 172 million<br />
iv) Banque indosuez, France-Commercial Credit-FF 64 million<br />
v) Banque indosuez, France-Commercial Credit-FF159 million<br />
The project has been completed and under commercial operation since November,<br />
1<strong>99</strong>7.<br />
3.8 JEYPORE-GAZUWAKA HVDC BACK TO BACK TRANSMISSION PROJECT:<br />
The Jeypore-Gazuwaka HVDC Back to Back Transmission Project (1x500 MW) was<br />
approved in February, 1<strong>99</strong>5. The project is an inter-regional transmission project to<br />
link Eastern Region and Southern Region <strong>of</strong> the country. The scope <strong>of</strong> project is as<br />
follows:-<br />
1. HVDC Back to Back station (1x500 MW) at Gazuwaka.<br />
2. Jeypore-Gazuwaka 400 KV D/C line (225 Kms.)<br />
3. Extension <strong>of</strong> associated sub-stations/terminal bays.<br />
The external assistance <strong>of</strong> 41.52 million Pound from West Merchant Bank, UK is<br />
available for HVDC Back to Back station. External assistance from ADB is also available<br />
for the transmission line and AC sub station. The major awards for 400 KV D/C Jeypore-<br />
Gazuwaka line and associated sub-station has already been made. Foundation, tower<br />
erection and stringing works in line and civil work <strong>of</strong> sub-station are in progress. The<br />
award <strong>of</strong> HVDC Back to Back station has already been made and civil works are in<br />
progress. The project is expected to be completed by 02/<strong>99</strong>.<br />
3.9 RAJASTHAN ATOMIC POWER PROJECT- B (RAPP-B) TRANSMISSION<br />
SYSTEM<br />
The Transmission line for evacuation <strong>of</strong> power from Rajasthan Atomic <strong>Power</strong><br />
Project - B (2x220 MW) was approved in September, 1<strong>99</strong>5. RAPP-B-KOTA 220 KV<br />
SC(LILO) has already been completed in Jan’95 and RAPP - B- Chittorgarh line has<br />
been completed in December 1<strong>99</strong>7 and Udaipur line work are in progress. The contract<br />
for RAPPB - Anta line is expected to be awarded by the end <strong>of</strong> 04/98. The project is<br />
expected to be completed by 03/<strong>99</strong>.<br />
119