months duration is being conducted throughout the year. The present intake is Generally<br />

15 trainess for each session. The Trainees are selected from various State Electricity<br />

Boards/Supply Undertakings <strong>of</strong> the country. The centre has trained 884 personnel<br />

including departmental <strong>of</strong>ficers/<strong>of</strong>ficials and realised training charges amounting to<br />

Rs.77.08 lakhs upto March, <strong>1<strong>99</strong>8</strong>.<br />

8.2.5 The financial requirement is given below:<br />

65<br />

(Rs. in lakhs)<br />

Actual 1<strong>99</strong>6-97 B.E. 1<strong>99</strong>7-98 R.E.1<strong>99</strong>7-98 B.E. <strong>1<strong>99</strong>8</strong>-<strong>99</strong><br />

Non-Plan : 15.46 16.65 21.88 23.88<br />

Plan (Rev.) : 3.77 21.00 15.00 22.00<br />

Plan (Cap.) : 19.64 130.00 110.00 130.00<br />

8.3 POWER SYSTEMS TRAINING INSTITUTE, BANGALORE<br />

8.3.1 The <strong>Power</strong> Systems Training Institute (PSTI), Bangalore, which has been set up to meet the<br />

growing demand <strong>of</strong> trained engineers in the field <strong>of</strong> <strong>Power</strong> Systems, is equipped to conduct<br />

training programmes in different disciplines <strong>of</strong> <strong>Power</strong> Systems. The training in various aspects<br />

<strong>of</strong> power systems operation imparted on the State-<strong>of</strong>-the-art Despatcher Training Simulator<br />

was commissioned in the year 1<strong>99</strong>0-91 as a part <strong>of</strong> UNDP aided project is well received by<br />

the participants.<br />

8.3.2 The PSTI Stage-II project on augmentation <strong>of</strong> training facilities has been sanctioned for an<br />

estimated capital cost <strong>of</strong> Rs.282.6 lakh. Under the project, the Computer Laboratory has<br />

been provided with the P.C. - based Computer system. This has enhanced the facility to train<br />

the engineers in the field <strong>of</strong> computer applications. The Protection Laboratory has been<br />

augmented with Solid State Relay Cubicles and a Disturbance Recorder-cum-Fault Locator.<br />

A P.C.-based Computer System for simulating Static Relay Education modules has been<br />

procured and commissioned. The Communication Laboratory has been commissioned with<br />

the field tunable PLCC equipment. The construction work in respect <strong>of</strong> additions to the<br />

hostel blocks and Guest House block has been completed. The construction <strong>of</strong> extension <strong>of</strong><br />

<strong>of</strong>fice block is under progress and it is likely to be completed during the year.<br />

8.3.3 In addition to the field <strong>of</strong> <strong>Power</strong> Systems, this Institute is planning to organise training courses<br />

at PSTI, Bangalore for <strong>of</strong>ficers <strong>of</strong> CEA at different levels to provide exposure to the<br />

technological developments in various fields and increase their level <strong>of</strong> competence and<br />

performance.<br />

8.3.4 The Institute has trained 4,748 middle level technical executive <strong>of</strong>ficers upto the end <strong>of</strong>