exchanges, for optimum utilisation <strong>of</strong> power resources for the country as a whole.<br />
Integrated operation <strong>of</strong> the 5 Regional Grids is coordinated round the clock through the<br />
five Regional Load Despatch Centres located at New Delhi, Mumbai, Bangalore,<br />
Calcutta and Shillong.<br />
2.3.2 During 1<strong>99</strong>7-98, the Northern, Western and Southern Regional Grids were operating<br />
independently while Eastern and North-Eastern Regional Grids were operating in<br />
parallel. The HVDC back-to-back link between Northern and Western regions, continued<br />
to operate round the clock, enabling maximisation <strong>of</strong> mutual assistance, particularly<br />
during emergencies in either Region. The HVDC back-to-back link at Chandrapur<br />
between Western and Southern regions has also been commissioned and regular<br />
exchange <strong>of</strong> power is taking place between the WR and SR. In addition inter-regional<br />
exchanges in radial mode, amongst other regions were maximised to the extent<br />
particularly feasible. Arrangements were made to transfer surplus power from Eastern<br />
Region to deficit States in other regions viz. Assam, AP , MP , Gujarat, Daman & Diu,<br />
Dadra & Nagar Haveli and Kerala. During the year 1<strong>99</strong>7-98, the inter-regional exchanges<br />
were 4420.4 MUs.<br />
2.3.3 The following important functions are being carried out by the Secretariats <strong>of</strong> the five REBs:<br />
i) Energy Accounting on daily basis.<br />
ii) Energy accounting on monthly basis for billing purposes<br />
iii) Formulation <strong>of</strong> policies for safe, secure and economic operation <strong>of</strong> the Regional<br />
Grid.<br />
iv) Operation Planning.<br />
v) Facilitation <strong>of</strong> commercial arrangements for inter-utility trading <strong>of</strong> power.<br />
2.3.4 The financial requirement for the above activity (wholly Non-Plan) is given below:<br />
33<br />
(Rs. in lakhs)<br />
Actual 1<strong>99</strong>6-97 B.E. 1<strong>99</strong>7-98 R.E.1<strong>99</strong>7-98 B.E. <strong>1<strong>99</strong>8</strong>-<strong>99</strong><br />
111.10 98.82 143.60 156.50<br />
2.4 NATIONAL ELECTRICITY SYSTEM OPERATION ORGANISATION:<br />
2.4.1 National Electricity System Operation Organisation (NESOO) set up within Central Electricity<br />
Authority has implemented UNDP-aided UNDP/86/005, which relates to modernisation <strong>of</strong><br />
training facilities at <strong>Power</strong> System Training Institute (PSTI), Bangalore,, development <strong>of</strong><br />
expertise in system operation and load despatch techniques. The title <strong>of</strong> equipment procured<br />
under the project has been transferred from UNDP to