Annexure-IV<br />

(Chapter-IV Para 11.1.7)<br />

PROJECTWISE DETAILS OF APPROVED COST, ACTUALS UPTO 3/97 VIS-A-VIS OUTLAY FOR 1<strong>99</strong>7-98 & <strong>1<strong>99</strong>8</strong>-<strong>99</strong><br />

NATIONAL THERMAL POWER CORPORATION LIMITED<br />

PROJECT COST<br />

1<strong>99</strong>7-98<br />

<br />

ACTUAL OUTLAY COMM.SCHEDULE<br />

SL.<br />

NO.<br />

NAME OF<br />

PROJ./SCHEME CAP<br />

<br />

ORIG. REVISED LATEST<br />

EXP. <br />

UPTO APPD. ANT.<br />

03/97<br />

<strong>1<strong>99</strong>8</strong>-<strong>99</strong> <br />

PPD. 1<strong>99</strong>7-98 LATEST<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

F. NEW SCHEMES<br />

24 TALCHER-II 2000 703064 0 32500 50 20800 04/05 01/02<br />

25 KAWAS-II 650 186000 0 25 25 500 01/02 00/01<br />

26 GANDHAR-II 650 186000 500 01/02 00/01<br />

27 ANTA GAS-II 650 186000 0 0 25 500 01/02 00/01<br />

28 AURAIYA-II 650 186000 0 25 500 01/02 00/01<br />

29 SEEPAT 2000 796625 0 100 50 500 06/07 03/04<br />

30 HYDERABAD METRO 650 195000 0 25 15 0 04/05 03/04<br />

31 RIHAND-II 1000 400000 0 25 0 0 05/06 04/05<br />

32 SOUTH OF MADRAS 1000 400000 0 5 25 50 06/07 05/06<br />

33 RAMAGUNNDAM-III 500 143545 0 25 0 0 05/06<br />

34 MANGALORE-I 0 0 791 0 0 0<br />

35 YAMUNA NAGAR 0 0 536 0 0 0<br />

36 OTHER UNIDENT PROJECT 2000 700000 0 10 0 0<br />

37 JT.VENTURE PARTICIPATION 10000 5 1895 2500 325<br />

SUB-TOTAL (F)<br />

TOTAL-I-GENERATION<br />

11750 0 0 4092234 1332 34610 2715 23675<br />

B+C+D+E 20515 2191284 3604342 3673676 2575264 172283 150961 197452<br />

F 11750 0 0 4092234 1332 34610 2715 23675<br />

TOTAL (B to F) 32265 2191284 3604342 7765910 2576596 206893 153676 221127<br />

III SURVEY AND INVESTIGATION 0 0 1000 402 200 200 200<br />

0 0 0 0<br />

IV. SCIENCE AND TECHNOLOGY 1978 2317 3307 1343 50 0 0<br />

131<br />

RS. IN LAKHS<br />

V. OTHER SCHEMES(APPD) 0 0 0 0<br />

0 0 0 0<br />

1 POWER MANAGEMENT INSTITUTE 1070 2532 2532 2225 110 49 0<br />

2 ENGG.COMPLEX (NOIDA) 1913 2776 2776 2633 37 33 0<br />

3 RES.COMPLEX (NOIDA) 1733 3818 3818 3245 80 65 0<br />

4 RESEARCH & DEVELOPOMENT (NOIDA) 1359 10 12 0<br />

5 ENVIRONMENT ACTION PLAN 0 23259 4314 3555 3186 6856<br />

6 RESETTLEMENT & REHABILITAION 0 2000 1290 200 150 250<br />

7 ENERGY CONSERVATION 208 63 75 123 240<br />

8 ASH UTILISATION 300 36 50 57 22<br />

TOTAL 4716 9126 34893 15165 4117 3675 7368<br />

I. PLANT BETTERMENT 0 0 5200 3098 1000 107 2677<br />

II. GENERATION SCHEMES 2191284 3604342 7765910 2576596 206893 153676 221127<br />

III. SURVEY INVESTIGATION 0 0 1000 402 200 200 200<br />

IV. SCIENCE & TECHNOLOGY 1978 2317 3307 1343 50 0 0<br />

V. OTHER SCHEMES(APPD) 4716 9126 34893 15165 4117 3675 7368<br />

VI. TRANSMISSION LINES<br />

GRAND TOTAL 2197978 3615785 7810310 2596604 212260 157658 231372