PHYSICAL STATUS:<br />

Total Quantity Completion Status %complete<br />

Dam Excavation 3,70,000 Cum. 2,<strong>99</strong>,257 Cum. 81<br />

Desilting Complex 8,76,000 Cum 2,59,650 Cum 31<br />

200 T Cable Anchors 465 No. 208 No. 45<br />

HRT Excavation 27,3<strong>99</strong> m. 24,070 m. 88<br />

Surge Shaft Excavation 301 m. 301 m. 100<br />

Machine Hall } 1,85,000 Cum. 1,85,000 Cum. 100<br />

Excavation }<br />

Transformer Hall }<br />

Excavation } 1,01,500 Cum. 1,01,500 Cum. 100<br />

TRT Excavation 982 m. 982 m. 100<br />

FINANCIAL STATUS<br />

The Cumulative Expenditure incurred upto March <strong>1<strong>99</strong>8</strong> is Rs. 2700.43 crore which is<br />

about 62% <strong>of</strong> the approved estimates <strong>of</strong> the project, i.e., Rs.4337.95 crore.<br />

11.8.6 Environment, Rehabilitation & Resettlement (E/R&R)<br />

The Project Information Centre at Jhakri is functioning well. Compensatory afforestation<br />

in non-forest land has been completed. So far, 52 nos. families have been identified as landless<br />

families who have been suitably compensated by way <strong>of</strong> allotment <strong>of</strong> alternate agricultural<br />

land in the project vicinity. Besides 43 persons have been given employment belonging to<br />

these families. The families who have been rendered houseless due to coming up <strong>of</strong> the project<br />

have been suitably compensated by way <strong>of</strong> allotment <strong>of</strong> constructed houses/cash compensation.<br />

NJPC’s policy statement on Environment, Rehabilitation and Resettlement has been prepared<br />

in association with its Advisors (E/R&R) and has been approved by the Board <strong>of</strong> Directors.<br />

11.9 DAMODAR VALLEY CORPORATION (DVC)<br />

11.9.1 The Damodar Valley Corporation was established on 7th July, 1948 by an Act <strong>of</strong> the Parliament.<br />

The Corporation has a full-time Chairman and two part-time Members. The part-time Members<br />

represent the States <strong>of</strong> Bihar and West Bengal. The objectives <strong>of</strong> the Corporation<br />

include the promotion and operation <strong>of</strong> the schemes for irrigation, transmission and<br />

distribution <strong>of</strong> energy, both hydro-electric and thermal, the promotion and operation<br />

<strong>of</strong> schemes for flood control in the Damodar river and its tributaries and<br />