NATIONAL HYDRO-ELECTRIC POWER CORPORATION LTD. ANNEXURE-X<br />
(CHAPTER-V PARA 1.7)<br />
DETAILS OF PROJECT-WISE COST ESTIMATES/LATEST COST, EXPENDITURE UPTO 3/97, BE/RE/<br />
ACTUALS 1<strong>99</strong>7-98 & BE <strong>1<strong>99</strong>8</strong>-<strong>99</strong><br />
(Rs. in crores)<br />
Sl. Name <strong>of</strong> the Project Approved Total Exp. Budget Revised Actual Budget Target date <strong>of</strong><br />
No. Cost/ Till Estimates Estimates Expenditure Estimates completion<br />
latest cost 31.3.1<strong>99</strong>7 1<strong>99</strong>7-98 1<strong>99</strong>7-98 1<strong>99</strong>7-98 <strong>1<strong>99</strong>8</strong>-<strong>99</strong><br />
(Unaudited)<br />
A.1<br />
HYDRO-ELECTRIC PROJECTS<br />
COMMISSIONED PROJECTS<br />
1. BAIRA-SIUL (198 MW) COMPLETED<br />
2. LOKTAK (105 MW) COMPLETED<br />
3. SALAL I (345 MW) COMPLETED<br />
4. TANAKPUR (120 MW) 379.12 373.52 4.90 2.25 0.00 1.50 COMPLETED-4/92<br />
5. CHAMERA I (540 MW) 2114.02 2034.46 8.05 7.79 4.67 7.00 COMPLETED-3/94<br />
6. SALAL II (345 MW) 307.68 258.27 2.28 2.25 0.50 2.00 COMPLETED-3/96<br />
7. URI (345 MW) 3300.00 2922.82 100.62 204.53 51.71 17.62 COMPLIETED-5/97<br />
A.2 APPROVED & ON GOING PROJECTS<br />
1. DULHASTI (390 MW) 3559.27 1509.81 518.42 447.63 356.75 468.16 MARCH ‘2001<br />
2. RANGIT (60 MW) 361.86 213.26 71.55 68.89 55.16 94.32 MARCH’1<strong>99</strong>9<br />
3. DHAULIGANGA (280 MW) 1881.49 38.56 65.03 34.73 25.58 92.90 SEPTEMBER ‘2004<br />
4. KOEL KARO (710 MW) 2624.29 19.11 5.00 2.25 2.42 5.00 MARCH ‘2005<br />
A.3 NEW SCHEMES<br />
1. CHAMERA III (300 MW) 2345.88 22.75 95.00 2.93 2.87 20.00 5 YRS AFTER<br />
SANCTION<br />
2. TEESTA-V 2166.34 0.00 5.00 0.50 0.00 5.00 8 YRS AFTER<br />
SANCTION<br />
3. LOKTAK DOWN STREAM 661.89 0.00 0.00 5.00 7 YRS AFTER<br />
SANCTION<br />
A.4 UNAPPROVED SCHEMES<br />
BAGLIHAR (450 MW) 19.48 0.00 0.00 TO RETURN<br />
BACK TO J&K<br />
SAWALKOT (600 MW) 10.14 0.00 0.00 TO RETURN<br />
BACK TO J&K<br />
B. RENOVATION OF POWER HOUSE 11.78 22.00 22.00 6.81 20.00<br />
C. SURVEY & INVESTIGATION 18.81 0.50 0.00 0.00 0.50<br />
TOTAL 7452.77 898.35 795.75 506.47 739.00<br />
137