PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
the channels excavated by the Corporation, the promotion <strong>of</strong> afforestation and control<br />
<strong>of</strong> soil erosion in the Damodar Valley, and the promotion <strong>of</strong> public health and the<br />
agricultural, industrial, economic and general well-being in the Damodar Valley and in<br />
areas <strong>of</strong> operation.<br />
11.9.2 The Corporation has already constructed four multipurpose dams at Tilaiya Konar, Maithon<br />
and Panchet and an irrigation system comprising a barrage on river Damodar at Durgapur<br />
and a canal system <strong>of</strong> 2459 kms. Damodar Valley Corporation has also constructed five<br />
thermal power stations viz. Bokaro A, Bokaro B, Chandrapura, Durgapur and Mejia TPS<br />
(Unit-I) and Unit-II, three hydel power stations namely Tilaiya, Maithon and Panchet; and<br />
one gas turbine station. DVC’s Transmission system runs to a total length <strong>of</strong> 5271 ckt. Kms.<br />
which is supported by 52 sub-stations. Besides this, DVC has also constructed more than<br />
8400 check dams for controlling run-<strong>of</strong>f soil and providing minor irrigation facilities.<br />
11.9.3 DVC’s system generated 5329 Mus electricity during April-December,’97 <strong>of</strong> which 4986<br />
MU was contributed by thermal stations, 331 MU by hydel power stations and 12 MU by<br />
gas turbine. The availability factor <strong>of</strong> 53% in January, 1<strong>99</strong>7 has increased to 70% availability<br />
factor in January, <strong>1<strong>99</strong>8</strong>.<br />
110