the channels excavated by the Corporation, the promotion <strong>of</strong> afforestation and control<br />

<strong>of</strong> soil erosion in the Damodar Valley, and the promotion <strong>of</strong> public health and the<br />

agricultural, industrial, economic and general well-being in the Damodar Valley and in<br />

areas <strong>of</strong> operation.<br />

11.9.2 The Corporation has already constructed four multipurpose dams at Tilaiya Konar, Maithon<br />

and Panchet and an irrigation system comprising a barrage on river Damodar at Durgapur<br />

and a canal system <strong>of</strong> 2459 kms. Damodar Valley Corporation has also constructed five<br />

thermal power stations viz. Bokaro A, Bokaro B, Chandrapura, Durgapur and Mejia TPS<br />

(Unit-I) and Unit-II, three hydel power stations namely Tilaiya, Maithon and Panchet; and<br />

one gas turbine station. DVC’s Transmission system runs to a total length <strong>of</strong> 5271 ckt. Kms.<br />

which is supported by 52 sub-stations. Besides this, DVC has also constructed more than<br />

8400 check dams for controlling run-<strong>of</strong>f soil and providing minor irrigation facilities.<br />

11.9.3 DVC’s system generated 5329 Mus electricity during April-December,’97 <strong>of</strong> which 4986<br />

MU was contributed by thermal stations, 331 MU by hydel power stations and 12 MU by<br />

gas turbine. The availability factor <strong>of</strong> 53% in January, 1<strong>99</strong>7 has increased to 70% availability<br />

factor in January, <strong>1<strong>99</strong>8</strong>.<br />

110