additional or improved environmental safeguards, if any, based on data and information<br />
now available.<br />
The Committee submitted its report to Governement <strong>of</strong> India on 11.11.1<strong>99</strong>7, Government<br />
<strong>of</strong> India constituted an Inter Ministerial Committee headed by, Secretary (Rural<br />
Development) and included representative <strong>of</strong> U.P.Government with a view to finalise<br />
the Government’s view on the recommendations <strong>of</strong> the Hanumatha Rao Committee.<br />
The report <strong>of</strong> the Inter-Ministerial Committee was submitted to the Government during March,<br />
<strong>1<strong>99</strong>8</strong>. Further action for the implementation <strong>of</strong> the recommendations would be taken once<br />
they are approved.<br />
5.5 TARGETS<br />
The following major activities have been planned during the year <strong>1<strong>99</strong>8</strong>-<strong>99</strong>:-<br />
1. Completion <strong>of</strong> Excavation/core stripping in the Main Dam.<br />
2 Completion <strong>of</strong> excavation <strong>of</strong> 4 Nos. Control Gate Shaft in Intake area.<br />
3. Engagement <strong>of</strong> Agency for Main Civil Works <strong>of</strong> Spillway.<br />
4. Completion <strong>of</strong> crane beam concreting in <strong>Power</strong> House.<br />
5. Completion <strong>of</strong> excavation in Butterfly Valve Chamber.<br />
6. Completion <strong>of</strong> excavation in Penstock Assembly Chamber Horizontal Penstock.<br />
7. Completion <strong>of</strong> excavation in Machine Hall/Transformer Hall.<br />
8. Start <strong>of</strong> concreting in Machine Hall <strong>of</strong> <strong>Power</strong> House.<br />
9. Completion <strong>of</strong> excavation <strong>of</strong> 2 No. Tail Race Tunnels.<br />
5.6 COMMISIONING SCHEDULE<br />
Tehri Hydro <strong>Power</strong> Project 1000 MW (4x250 MW) is likely to be commissioned by<br />
March, 2002.<br />
5.7 EXPENDITURE ON THE PROJECT<br />
The total expenditure incurred so far on the project till March, <strong>1<strong>99</strong>8</strong> was Rs. 1650.86<br />
crore (provisional) (including Rs. 8.41 crore spent on associated Transmission System<br />
being executed by PGCIL).<br />
6. NATHPA JHAKRI POWER CORPORATION (NJPC):<br />
NATHPA JHAKRI HYDRO ELECTRIC POWER PROJECT (6X250 MW):<br />
NJPC is presently executing its firs mega project, namely, Nathpa Jhakri Hydro Electric<br />
<strong>Power</strong> Project (NJHPP) in Himachal Pradesh with the resources funded by World Bank.<br />
The details <strong>of</strong> the project as under:<br />
124