10.3. Energy Conservation in Transmission and Distribution <strong>of</strong> <strong>Power</strong>:<br />
10.3.1 Energy Audits in Distribution Networks <strong>of</strong> SEBs<br />
(i) The pilot project on energy audit in the distribution network <strong>of</strong> the West Bengal<br />
State Electricity Board, sanctioned in March, 1<strong>99</strong>4 for contribution <strong>of</strong> Rs.181.03<br />
lakh (50% <strong>of</strong> the total cost), is likely to be completed during <strong>1<strong>99</strong>8</strong>-<strong>99</strong>.<br />
(ii) The pilot project on Energy Audit in the distribution network <strong>of</strong> Kerla State<br />
Electricity Board sanctioned in November, 1<strong>99</strong>4 for contribution <strong>of</strong> Rs.114.62<br />
lakh (50% <strong>of</strong> the total cost) is under progress and is expected to be completed by<br />
March, 1<strong>99</strong>9.<br />
(iii) A pilot project on energy audit in the distribution network <strong>of</strong> Haryana State<br />
Electricity Board, sanctioned in January, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs.117.89 lakh<br />
(50% <strong>of</strong> the total cost), has been taken up for implementation by HSEB and is<br />
likely to be completed in <strong>1<strong>99</strong>8</strong>-<strong>99</strong>.<br />
(iv) A project on energy audit in the distribution network <strong>of</strong> Punjab State Electricity<br />
Board has been sanctioned in August, 1<strong>99</strong>7 for contribution <strong>of</strong> Rs.223.43 lakh<br />
(50% <strong>of</strong> the total cost) for implementation by PSEB. The project has a completion<br />
schedule <strong>of</strong> 2 years.<br />
10.3.2 Demonstration/Pilot Projects on Energy Conservation in the Distribution Networks <strong>of</strong><br />
SEBs/Rural Electric Cooperatives.<br />
(i) The pilot project for reduction <strong>of</strong> T&D losses in the system through installation<br />
<strong>of</strong> 3000 LT switched capacitors, sanctioned in February, 1<strong>99</strong>4 for contribution <strong>of</strong><br />
Rs.245.60 lakh, is under implementation through REC in Andhra Pradesh,<br />
Haryana, Punjab and Tamil Nadu. As Gujarat, which was expected to participate<br />
in the project, has opted out, the scope <strong>of</strong> the project has been restricted to 2374<br />
capacitors and the Govt. contribution reduced to Rs.1<strong>99</strong>.32 lakh. The project is<br />
expected to be completed by October, <strong>1<strong>99</strong>8</strong>.<br />
(ii) The pilot project for reduction <strong>of</strong> T&D loses in the system through installation <strong>of</strong><br />
3000 Amorphous Core transformers in the distribution networks <strong>of</strong> various SEBs,<br />
sanctioned in March, 1<strong>99</strong>4 for contribution <strong>of</strong> Rs.300 lakh (75% <strong>of</strong> the total cost)<br />
is under implementation through REC. The project is likely to be completed by<br />
March, 1<strong>99</strong>9.<br />
(iii) Pilot projects on remote controlled load management in the distribution networks<br />
<strong>of</strong> Punjab State Electricity Board (sanctioned in March, 1<strong>99</strong>6 for contribution <strong>of</strong><br />