CHAPTER II<br />

GENERAL REVIEW AND HIGHLIGHTS<br />

1. Since “Electricity” stands included in the Concurrent List in the VII Schedule <strong>of</strong> the<br />

Constitution <strong>of</strong> India, both the Centre and the States have concurrent jurisdiction <strong>of</strong><br />

the subject. While the <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> and the Central Electricity Authority (CEA)<br />

are responsible for formation <strong>of</strong> national policies for development <strong>of</strong> power and for<br />

coordination <strong>of</strong> related activities and optimum utilisation <strong>of</strong> the available resources,<br />

it is the States/Union Territories that carry out the implementation <strong>of</strong> power<br />

development programmes and supply <strong>of</strong> power to the ultimate consumers. The efforts<br />

<strong>of</strong> the State Governments in this regard are supplemented by the Central Government<br />

by establishing a number <strong>of</strong> generation and transmission projects, which deal with<br />

bulk power.<br />

2. GENERATING CAPACITY ADDITION<br />

2.1 Targets and achievement in capacity addition programme during VIII Plan<br />

The 8th Plan programme envisaged a capacity addition <strong>of</strong> 30538 MW. As against<br />

this, 16422.6 MW has been added. Sector-wise and type-wise details <strong>of</strong> these are<br />

shown in table below:-<br />

(In Mega Watt)<br />

Target Achievement<br />

Centre State Private Total Centre State Private Total<br />

Hydro 3260 5860 162 9282 1465 794.7 168 2427.7<br />

Thermal 84<strong>99</strong> 9009 2648 20156 6252 6040.5 1262.4 13554.9<br />

Nuclear 1100 — — 1100 440 — — 440<br />

Total 12859 14869 2810 30538 8157 6835.2 1430.4 16422.6<br />

The actual capacity addition <strong>of</strong> 16422.6 MW during the VIII Plan is about 46% less<br />

than the target and 23% less than the capacity added during the VII Plan. The slippages<br />

in case <strong>of</strong> hydel projects are as high as 74% <strong>of</strong> the target.<br />

The aggregate capacity <strong>of</strong> 2868.5 MW consisting <strong>of</strong> 835 MW hydro and 2033.5<br />

MW thermal was targetted for commissioning during the year 1<strong>99</strong>6-97. Against the<br />

targetted capacity, the total generating capacity commissioned/rolled during the year<br />

1<strong>99</strong>6-97 was 1624.5 MW consisting <strong>of</strong> 660.5 MW hydro and 964 MW thermal.<br />