PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CHAPTER II<br />
GENERAL REVIEW AND HIGHLIGHTS<br />
1. Since “Electricity” stands included in the Concurrent List in the VII Schedule <strong>of</strong> the<br />
Constitution <strong>of</strong> India, both the Centre and the States have concurrent jurisdiction <strong>of</strong><br />
the subject. While the <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> and the Central Electricity Authority (CEA)<br />
are responsible for formation <strong>of</strong> national policies for development <strong>of</strong> power and for<br />
coordination <strong>of</strong> related activities and optimum utilisation <strong>of</strong> the available resources,<br />
it is the States/Union Territories that carry out the implementation <strong>of</strong> power<br />
development programmes and supply <strong>of</strong> power to the ultimate consumers. The efforts<br />
<strong>of</strong> the State Governments in this regard are supplemented by the Central Government<br />
by establishing a number <strong>of</strong> generation and transmission projects, which deal with<br />
bulk power.<br />
2. GENERATING CAPACITY ADDITION<br />
2.1 Targets and achievement in capacity addition programme during VIII Plan<br />
The 8th Plan programme envisaged a capacity addition <strong>of</strong> 30538 MW. As against<br />
this, 16422.6 MW has been added. Sector-wise and type-wise details <strong>of</strong> these are<br />
shown in table below:-<br />
(In Mega Watt)<br />
Target Achievement<br />
Centre State Private Total Centre State Private Total<br />
Hydro 3260 5860 162 9282 1465 794.7 168 2427.7<br />
Thermal 84<strong>99</strong> 9009 2648 20156 6252 6040.5 1262.4 13554.9<br />
Nuclear 1100 — — 1100 440 — — 440<br />
Total 12859 14869 2810 30538 8157 6835.2 1430.4 16422.6<br />
The actual capacity addition <strong>of</strong> 16422.6 MW during the VIII Plan is about 46% less<br />
than the target and 23% less than the capacity added during the VII Plan. The slippages<br />
in case <strong>of</strong> hydel projects are as high as 74% <strong>of</strong> the target.<br />
The aggregate capacity <strong>of</strong> 2868.5 MW consisting <strong>of</strong> 835 MW hydro and 2033.5<br />
MW thermal was targetted for commissioning during the year 1<strong>99</strong>6-97. Against the<br />
targetted capacity, the total generating capacity commissioned/rolled during the year<br />
1<strong>99</strong>6-97 was 1624.5 MW consisting <strong>of</strong> 660.5 MW hydro and 964 MW thermal.<br />
3