(b) NTPC-BSES Joint Venture<br />
NTPC and BSES have joined hands to promote a Joint Venture Company namely<br />
Utility <strong>Power</strong>tech Ltd. (UPL) in Himachal Pradesh with the authorised share capital <strong>of</strong><br />
Rs.2 crore. This JV company is <strong>of</strong>fering services for construction, erection and power<br />
management services for projects in power and other sectors. NTPC and BSES will<br />
subscribe to the paid up share capital <strong>of</strong> the company in the ratio <strong>of</strong> 49:51 respectively.<br />
(c) Other Joint Venture and Take-over Proposals<br />
A Joint Venture Company is proposed to be set-up keeping in view the growing potential<br />
in Renovation & Modernisation (R&M) <strong>of</strong> existing power stations. This company would<br />
take-up R&M jobs <strong>of</strong> various utilities and facilitate improvement in utilising the existing<br />
installed capacity.<br />
11.1.4 CONSULTANCY WING<br />
The Consultancy Wing incorporated in 1989 has registered a turnover <strong>of</strong> Rs.9.57 crores<br />
and received orders worth Rs.5.42 crore during 1<strong>99</strong>6-97.<br />
11.1.5 CENTRE FOR POWER EFFICIENCY & ENVIRONMENT PROTECTION:<br />
In order to focus attention <strong>of</strong> improving the availability <strong>of</strong> resources <strong>of</strong> power generation<br />
for sustained operation a centre for power efficiency and environmental protection<br />
(Cenpeep) has been established with the assistance <strong>of</strong> United States Agency for<br />
International Development (USAID). This centre would act as a resource centre for<br />
assimilation, dissemination and demonstration <strong>of</strong> technical know-how to bring about<br />
improvements in environment in the <strong>Power</strong> Sector.<br />
11.1.6 Physical & Financial performance:<br />
The summarised position <strong>of</strong> operational targets and achievements are as under:<br />
80<br />
(in MUs)<br />
Actuals Program Actual Program<br />
1<strong>99</strong>6-97 1<strong>99</strong>7-98 1<strong>99</strong>7-98 <strong>1<strong>99</strong>8</strong>-<strong>99</strong><br />
Generation 973<strong>99</strong> 98000 106291 <strong>99</strong>001<br />
Plant Load Factor % 77 70.6 75.2 71.34<br />
(Coal units)