8.1.2 ACTIVITIES/ACHIEVEMENTS<br />

Training Output:<br />

Upto March, <strong>1<strong>99</strong>8</strong>, 45066 Personnel <strong>of</strong> various levels from different organisations have<br />

been trained at the four Training Institutes <strong>of</strong> NPTI since their inception. About 4500<br />

personnel have been training on the 210 MW simulator at Badarpur Institute since its<br />

installation in 1983. The training output in terms <strong>of</strong> trainee weeks is 24592 vis-a-vis<br />

the target <strong>of</strong> 19358 trainee weeks.<br />

In addition, during the year 1<strong>99</strong>6-97, NPTI launched first ever One-year Post Graduate<br />

Diploma Course in Thermal <strong>Power</strong> Plant Engineering, duly recognised by AICTE. The<br />

First Batch which commenced on 5th August, 1<strong>99</strong>6 has completed the course on 31.7.97.<br />

The candidates after completing the course need not undergo any other statutory training<br />

as per the requirement <strong>of</strong> Indian Electricity Rules. A large number <strong>of</strong> candidates have<br />

been picked up through Campus recruitment by renowned <strong>Power</strong> Sector organisations.<br />

While the second batch <strong>of</strong> the course has commenced on 4th August,1<strong>99</strong>7, third batch<br />

would commence in the first week <strong>of</strong> August, <strong>1<strong>99</strong>8</strong>.<br />

Specialised courses are being organised as per need <strong>of</strong> the <strong>Power</strong> sector organisations.<br />

Computer Based Training (CBT) identified as one <strong>of</strong> the means for delivering and<br />

replicating consistent high quality training has been fully established by NPTI with the<br />

assistance <strong>of</strong> ODA, UK. NPTI has set up Open Learning Centres at its regional institutes<br />

and a dedicated unit at its Headquarters. A large number <strong>of</strong> multi-media CBT packages<br />

on different topics have since been developed and are available for use by <strong>Power</strong> Sector<br />

companies at their Training Centres.<br />

8.1.3 STATUS OF SCHEMES<br />

The following on-going schemes are under implementation:<br />

i) Installation <strong>of</strong> 210 MW Simulator at Nagpur Institute:<br />

The scheme was sanctioned on 13.8.90 at an estimated cost <strong>of</strong> Rs. 1737.21 lakh. The<br />

orders for manufacturing/installation <strong>of</strong> 210 MW Simulator were placed on M/s. ECIL<br />

Hyderabad on 26.3.1<strong>99</strong>3. Keeping in view the various committed/obligatory expenditure<br />

like excise duty etc., it is estimated that cost <strong>of</strong> the scheme will increased to Rs. 1806<br />

lakh. A provision <strong>of</strong> Rs. 336.74 lakh was made in the RE 1<strong>99</strong>7-98 against the BE <strong>of</strong><br />

60