04.08.2013 Views

PERFORMANCE BUDGET 1998-99 - Ministry of Power

PERFORMANCE BUDGET 1998-99 - Ministry of Power

PERFORMANCE BUDGET 1998-99 - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(vi) A project for training <strong>of</strong> 1000 <strong>of</strong>ficers from Banks, SEBs and other organisations,<br />

in energy efficient pumping system, sanctioned in February, 1<strong>99</strong>5 at a cost <strong>of</strong><br />

Rs.10 lakh, is under implementation through the Rural Electrification Corporation<br />

Ltd. (REC).<br />

(vii) A project for rectification <strong>of</strong> 1000 agricultural pumpsets in Karnool and<br />

Rangareddy districts <strong>of</strong> Andhra Pradesh, sanctioned in March, 1<strong>99</strong>7 for a contribution<br />

<strong>of</strong> Rs. 7.50 lakh (50% <strong>of</strong> the total cost) is under implementation by the Society for<br />

Energy, Environment and Rural Development (SEERD), Hyderabad.<br />

(viii) A project for preparation <strong>of</strong> manual on energy efficiency in pumping system,<br />

sanctioned in February, 1<strong>99</strong>7 for contribution <strong>of</strong> Rs. 5 lakh is under implementation<br />

by Confederation <strong>of</strong> Indian Industry, Madras. The project is expected to be<br />

completed by June, <strong>1<strong>99</strong>8</strong>.<br />

(ix) A project for preparation <strong>of</strong> manual on application <strong>of</strong> variable speed drive for<br />

energy efficiency, sanctioned in March, 1<strong>99</strong>7 for contribution <strong>of</strong> Rs. 5 lakh is<br />

under implementation by Confederation <strong>of</strong> Indian Industry, Madras. The project<br />

is expected to be completed by July, <strong>1<strong>99</strong>8</strong>.<br />

10.4.2 Energy Audits, Demonstration projects, Training Programmers and Studies to relating<br />

to Industry Sector<br />

(i) A project for preparation <strong>of</strong> DPR for rapid displacement heat pulping process in<br />

paper industry, sanctioned in February, 1<strong>99</strong>6 at a cost <strong>of</strong> Rs. 4.50 lakh, is under<br />

implementation through EMC and the Confederation <strong>of</strong> Indian Industries (CII).<br />

The project is expected to be completed in <strong>1<strong>99</strong>8</strong>-<strong>99</strong>.<br />

(ii) A feasibility study for co-generation in small and medium agro-paper mills,<br />

sanctioned in March, 1<strong>99</strong>6 at a cost <strong>of</strong> Rs.10 lakh, is under preparation by the<br />

Indian Agro Paper Mills Association, New Delhi.<br />

(iii) An application oriented training programme for the first-line engineers <strong>of</strong> process<br />

& engineering industries, sanctioned in December, 1<strong>99</strong>4 at a cost <strong>of</strong> Rs. 4.15<br />

lakh, is under implementation in A.P. by the Andhra Pradesh Productivity Council<br />

(APPC).<br />

(iv) The research-cum-demonstration project on energy conservation in Aluminium<br />

Electrolysis by bringing down the operating temperature <strong>of</strong> Electrolyte, sanctioned<br />

in March, 1<strong>99</strong>5 at a cost <strong>of</strong> Rs.18 lakh, is under implementation through EMC<br />

75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!