PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(vi) A project for training <strong>of</strong> 1000 <strong>of</strong>ficers from Banks, SEBs and other organisations,<br />
in energy efficient pumping system, sanctioned in February, 1<strong>99</strong>5 at a cost <strong>of</strong><br />
Rs.10 lakh, is under implementation through the Rural Electrification Corporation<br />
Ltd. (REC).<br />
(vii) A project for rectification <strong>of</strong> 1000 agricultural pumpsets in Karnool and<br />
Rangareddy districts <strong>of</strong> Andhra Pradesh, sanctioned in March, 1<strong>99</strong>7 for a contribution<br />
<strong>of</strong> Rs. 7.50 lakh (50% <strong>of</strong> the total cost) is under implementation by the Society for<br />
Energy, Environment and Rural Development (SEERD), Hyderabad.<br />
(viii) A project for preparation <strong>of</strong> manual on energy efficiency in pumping system,<br />
sanctioned in February, 1<strong>99</strong>7 for contribution <strong>of</strong> Rs. 5 lakh is under implementation<br />
by Confederation <strong>of</strong> Indian Industry, Madras. The project is expected to be<br />
completed by June, <strong>1<strong>99</strong>8</strong>.<br />
(ix) A project for preparation <strong>of</strong> manual on application <strong>of</strong> variable speed drive for<br />
energy efficiency, sanctioned in March, 1<strong>99</strong>7 for contribution <strong>of</strong> Rs. 5 lakh is<br />
under implementation by Confederation <strong>of</strong> Indian Industry, Madras. The project<br />
is expected to be completed by July, <strong>1<strong>99</strong>8</strong>.<br />
10.4.2 Energy Audits, Demonstration projects, Training Programmers and Studies to relating<br />
to Industry Sector<br />
(i) A project for preparation <strong>of</strong> DPR for rapid displacement heat pulping process in<br />
paper industry, sanctioned in February, 1<strong>99</strong>6 at a cost <strong>of</strong> Rs. 4.50 lakh, is under<br />
implementation through EMC and the Confederation <strong>of</strong> Indian Industries (CII).<br />
The project is expected to be completed in <strong>1<strong>99</strong>8</strong>-<strong>99</strong>.<br />
(ii) A feasibility study for co-generation in small and medium agro-paper mills,<br />
sanctioned in March, 1<strong>99</strong>6 at a cost <strong>of</strong> Rs.10 lakh, is under preparation by the<br />
Indian Agro Paper Mills Association, New Delhi.<br />
(iii) An application oriented training programme for the first-line engineers <strong>of</strong> process<br />
& engineering industries, sanctioned in December, 1<strong>99</strong>4 at a cost <strong>of</strong> Rs. 4.15<br />
lakh, is under implementation in A.P. by the Andhra Pradesh Productivity Council<br />
(APPC).<br />
(iv) The research-cum-demonstration project on energy conservation in Aluminium<br />
Electrolysis by bringing down the operating temperature <strong>of</strong> Electrolyte, sanctioned<br />
in March, 1<strong>99</strong>5 at a cost <strong>of</strong> Rs.18 lakh, is under implementation through EMC<br />
75