upto March,‘97. 100 hectares <strong>of</strong> land has been taken possession in 1<strong>99</strong>7-98 and<br />
construction <strong>of</strong> ash dyke has been started thereon. An expenditure <strong>of</strong> Rs.713.40 lakh<br />
is anticipated during 1<strong>99</strong>7-98 and a provision <strong>of</strong> Rs.529 lakh has been made in<br />
BE <strong>1<strong>99</strong>8</strong>-<strong>99</strong>.<br />
4.1.11 AUGMENTATION OF FIRE PROTECTION SYSTEM AT BTPS:<br />
The existing fire protection facilities at BTPS were installed in the period 1973-75<br />
during the commissioning <strong>of</strong> the Stage-I (3x100 MW) <strong>of</strong> the project. Marginal extensions<br />
to the existing facilities were provided during the implementation <strong>of</strong> stage-II (1x210<br />
MW) and Stage-III (1x210 MW) <strong>of</strong> the project. In 1984, CEA recommended certain<br />
fire preventive measures including provision <strong>of</strong> certain facilities/equipment to be taken<br />
up at the power station. Also in line with Govt. <strong>of</strong> India decision to introduce Central<br />
Industrial Security Force (CISF) in public sector enterprises for security coverage, CISF<br />
conducted the survey in 1982 in respect <strong>of</strong> fire fighting system at BTPS. Survey report<br />
recommended additions <strong>of</strong> certain fire fighting/fire prevention facilities to be introduced<br />
in BTPS prior to taking over <strong>of</strong> BTPS fire wing by CISF . CEA, further observed that<br />
the high velocity /medium velocity spray system for cable gallery at 4.0 MT level - 3.0<br />
MT level - 3.0 MT level cable shaft etc. along with Turbine Oil Tank i.e. Oil Pipe & Oil<br />
Purification system etc. should also be included in the proposal.<br />
Based on the recommendations <strong>of</strong> CEA/CISF (Fire wing), a proposal for augmentation<br />
<strong>of</strong> Fire Protection System at BTPS was approved by Govt. <strong>of</strong> India for Rs.456.05 lakh.<br />
An expenditure <strong>of</strong> Rs.412.19 lakh has been incurred till 31.3.97. The anticipated<br />
expenditure during 1<strong>99</strong>7-98 is Rs.2 lakh. Provision <strong>of</strong> Rs.32.00 lakh has been made in<br />
BE <strong>1<strong>99</strong>8</strong>-<strong>99</strong>.<br />
4.1.12 AUGMENTATION OF CONDENSER COOLING SYSTEM:<br />
BTPS is getting black stinking sewerage like water with highly corrosive/scaling<br />
components, which is damaging the condenser tubes. Accordingly, it is advised to<br />
change the material from “Admiralty Bras to cupro Nickel 90/10 as an immediate<br />
measure to save the condenser tubes because each time a tube leakage occurs and the<br />
unit load is reduced to less than 50% with oil support. In BHEL`s opinion it has become<br />
necessary to change at least the condenser tube material <strong>of</strong> 2x100 MW units during the<br />
financial year 1<strong>99</strong>7-98 costing around Rs.4.90 crore. An expenditure <strong>of</strong> Rs.410.83 lakh<br />
has been incurred during 1<strong>99</strong>7-98 and a provision <strong>of</strong> Rs.79 lakh has been made in BE<br />
<strong>1<strong>99</strong>8</strong>-<strong>99</strong>.<br />
43