PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rs.443.88 lakh-80% <strong>of</strong> the total cost) and Rajasthan State Electricity Board<br />
(sanctioned in September, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs.297.50 lakh- 80% <strong>of</strong> the<br />
total cost) are under implementation. Each <strong>of</strong> the two projects has a completion<br />
schedule <strong>of</strong> two years. Similar projects in the distribution network <strong>of</strong> TNEB (for<br />
contribution <strong>of</strong> Rs.475 lakh - 80% <strong>of</strong> the total cost), UPSEB (for contribution <strong>of</strong><br />
Rs.208 lakh - 80% <strong>of</strong> the total cost) and HSEB (for contribution <strong>of</strong> Rs.237.22<br />
lakh - 80% <strong>of</strong> the total cost) have been sanctioned in 1<strong>99</strong>7-98. Each <strong>of</strong> the TNEB<br />
and UPSEB project has a completion schedule <strong>of</strong> 2 years while HSEB project, <strong>of</strong><br />
1 year.<br />
(iv) A pilot project on reduction in T&D losses by conversion from low voltage three<br />
phase distribution to the high voltage single phase distribution, sanctioned in<br />
March, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs.320 lakh (total cost: Rs.427 lakh), is under<br />
implementation through REC in TNEB, RSEB & KEB. The project has a<br />
completion schedule <strong>of</strong> two years.<br />
(v) The pilot project on peak load reduction in the evening through conversion <strong>of</strong><br />
incandescent lamps to energy efficient fluorescent tubes with electronic ballasts<br />
was sanctioned in March, 1<strong>99</strong>5 for contribution <strong>of</strong> Rs.46.67 lakh (total cost) for<br />
implementation in the distribution network <strong>of</strong> APSEB through REC and HMT.<br />
The entire amount was released to REC alongwith the sanction. The project has<br />
since been cancelled.<br />
(vi) An energy conservation-cum-system improvement project, involving installation<br />
<strong>of</strong> Amorphous Core Transformers and LT Capacitors, sanctioned in March, 1<strong>99</strong>6<br />
for contribution <strong>of</strong> Rs.508 lakh (80% <strong>of</strong> the total cost), in under implementation<br />
in the distribution network <strong>of</strong> the Rural Electrical Cooperative at Sirsilla, Andhra<br />
Pradesh, through REC. The project is scheduled to be completed within a period<br />
<strong>of</strong> six years. Similar schemes for implementation in the distribution networks <strong>of</strong><br />
the Electric Cooperatives in Hukeri (Karnataka) and Kuppam (AP) are under<br />
consideration.<br />
(vii) A demonstration project on energy conservation through restructuring <strong>of</strong><br />
distribution network, conversion <strong>of</strong> three-phase motors to single phase motors,<br />
and provision <strong>of</strong> compact fluorescent lamps for street lighting, sanctioned in<br />
September, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs.31.522 lakh (80% <strong>of</strong> the total cost), is<br />
under implementation in Chandi village in Medak Distt. <strong>of</strong> Andhra Pradesh. It is<br />
scheduled to be completed in 16 months.<br />
72