Rs.443.88 lakh-80% <strong>of</strong> the total cost) and Rajasthan State Electricity Board<br />

(sanctioned in September, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs.297.50 lakh- 80% <strong>of</strong> the<br />

total cost) are under implementation. Each <strong>of</strong> the two projects has a completion<br />

schedule <strong>of</strong> two years. Similar projects in the distribution network <strong>of</strong> TNEB (for<br />

contribution <strong>of</strong> Rs.475 lakh - 80% <strong>of</strong> the total cost), UPSEB (for contribution <strong>of</strong><br />

Rs.208 lakh - 80% <strong>of</strong> the total cost) and HSEB (for contribution <strong>of</strong> Rs.237.22<br />

lakh - 80% <strong>of</strong> the total cost) have been sanctioned in 1<strong>99</strong>7-98. Each <strong>of</strong> the TNEB<br />

and UPSEB project has a completion schedule <strong>of</strong> 2 years while HSEB project, <strong>of</strong><br />

1 year.<br />

(iv) A pilot project on reduction in T&D losses by conversion from low voltage three<br />

phase distribution to the high voltage single phase distribution, sanctioned in<br />

March, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs.320 lakh (total cost: Rs.427 lakh), is under<br />

implementation through REC in TNEB, RSEB & KEB. The project has a<br />

completion schedule <strong>of</strong> two years.<br />

(v) The pilot project on peak load reduction in the evening through conversion <strong>of</strong><br />

incandescent lamps to energy efficient fluorescent tubes with electronic ballasts<br />

was sanctioned in March, 1<strong>99</strong>5 for contribution <strong>of</strong> Rs.46.67 lakh (total cost) for<br />

implementation in the distribution network <strong>of</strong> APSEB through REC and HMT.<br />

The entire amount was released to REC alongwith the sanction. The project has<br />

since been cancelled.<br />

(vi) An energy conservation-cum-system improvement project, involving installation<br />

<strong>of</strong> Amorphous Core Transformers and LT Capacitors, sanctioned in March, 1<strong>99</strong>6<br />

for contribution <strong>of</strong> Rs.508 lakh (80% <strong>of</strong> the total cost), in under implementation<br />

in the distribution network <strong>of</strong> the Rural Electrical Cooperative at Sirsilla, Andhra<br />

Pradesh, through REC. The project is scheduled to be completed within a period<br />

<strong>of</strong> six years. Similar schemes for implementation in the distribution networks <strong>of</strong><br />

the Electric Cooperatives in Hukeri (Karnataka) and Kuppam (AP) are under<br />

consideration.<br />

(vii) A demonstration project on energy conservation through restructuring <strong>of</strong><br />

distribution network, conversion <strong>of</strong> three-phase motors to single phase motors,<br />

and provision <strong>of</strong> compact fluorescent lamps for street lighting, sanctioned in<br />

September, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs.31.522 lakh (80% <strong>of</strong> the total cost), is<br />

under implementation in Chandi village in Medak Distt. <strong>of</strong> Andhra Pradesh. It is<br />

scheduled to be completed in 16 months.<br />