7.2.2 The World Bank has provided a loan <strong>of</strong> US $ 5 million for upgrading the technical skills <strong>of</strong><br />

CEA, CWC, GSI and other Government Department Officers engaged in the development<br />

<strong>of</strong> Hydro <strong>Power</strong> projects in India. Sanction to incur an expenditure <strong>of</strong> Rs.16 crore only<br />

equivalent to US $ 5 million, as grants to CEA by entering into a contract agreement between<br />

CEA and M/s. Hydro Quebec International, Canada and M/s. Harza Engineering Company,<br />

USA was received in August,1<strong>99</strong>4. The expenditure under the scheme include payment to<br />

foreign consultants for conducting training to <strong>of</strong>ficers, procurement <strong>of</strong> audio visual equipments,<br />

furniture, computer hardware and s<strong>of</strong>tware, procurement <strong>of</strong> IS/IEC specifications, furnishing<br />

<strong>of</strong> Lecture Hall, and visit <strong>of</strong> CEA <strong>of</strong>ficers to Canada/USA.<br />

7.2.3 During the year 1<strong>99</strong>5-96, an inception meeting was held between Consultants and CEA,<br />

CWC & GSI <strong>of</strong>ficers. Another meeting with computer experts <strong>of</strong> M/s. HQI Canada for<br />

“Need Assessment for CADD” was held. 22 Engineers <strong>of</strong> CEA/CWC were trained <strong>of</strong><br />

which 5 members in Hydro <strong>Power</strong> planning, 5 members in River Basin Planning and<br />

12 members in CADD/Computer system.<br />

During 1<strong>99</strong>6-97, 12 engineers <strong>of</strong> CWC/GSI have been trained on Civil/Geo-tech Design<br />

Module and 10 engineers <strong>of</strong> CEA have been training in USA on Electrical/Mechanical<br />

Design Module. Another 12 engineers <strong>of</strong> CEA/CWC and GSI were trained in Canada<br />

on Hydro Construction Module.<br />

During 1<strong>99</strong>7-98, the following environment and ice workshop programme were<br />

organised:<br />

i) Construction and Cost Estimating;<br />

ii) Electrical Design;<br />

iii) Plan Control & Automation and<br />

iv) Mechanical Design.<br />

7.2.4 Against the sanctioned cost <strong>of</strong> the scheme <strong>of</strong> Rs.16 crore, an expenditure <strong>of</strong> Rs.9.02 crore<br />

has been incurred upto March, <strong>1<strong>99</strong>8</strong>. During <strong>1<strong>99</strong>8</strong>-<strong>99</strong>, it is proposed to complete the remaining<br />

activities <strong>of</strong> the follow-up in-India training in various Modules by the Consultants and anticipated<br />

visit <strong>of</strong> senior <strong>of</strong>ficers to Canada/USA. An amount <strong>of</strong> Rs.5.28 crore has been provided in<br />

<strong>1<strong>99</strong>8</strong>-<strong>99</strong> to meet the payment <strong>of</strong> invoices <strong>of</strong> the Consultants towards income-tax, balance<br />

payment <strong>of</strong> computers and travel expenses towards visit to Canada/USA.<br />