upgrade the technology. Active inter-action and liaison with the Bureau <strong>of</strong> Indian<br />

Standards are being maintained through participation in and deliberation <strong>of</strong> various<br />

technological committees involved with the formation and revision <strong>of</strong> guidelines for<br />

various structures/elements <strong>of</strong> hydro power projects etc. As part <strong>of</strong> its efforts in the<br />

field <strong>of</strong> Research & Development a separate division “Research Development” has<br />

been created to look after the problems relating to silt at various operational projects<br />

and import substitution <strong>of</strong> spares.<br />

A post construction Environmental Impact Assessment has been conducted in Chamera<br />

stage - I project through Satellite Remote Sensing Data processing and through<br />

Geographical Information system.<br />

11.2.6 CONSULTANCY SERVICES<br />

With a view to encash the vast experience and expertise gained by the corporation over<br />

the last 20 years, in the investigation, design, construction and operation <strong>of</strong> Hydro<br />

<strong>Power</strong> Projects, the Corporation has set up a Consultancy wing. During the year 1<strong>99</strong>7-<br />

98 the Corporation has got fresh consultancy assignments from Northern Railway,<br />

THDC, NJPC, NCB, KSEB APSEB, CWC and JKPDCC. Negotiations are in the<br />

pipeline with Border Roads Organisation (BRO), West Bengal <strong>Power</strong> Development<br />

Corporation Ltd. (WBPDCL) and Shree Maheshwar <strong>Power</strong> Corporation. The<br />

consultancy work is gaining more and more importance and NHPC is also negotiating<br />

with foreign companies for Tuirial H.E.Project, Mizoram and some other projects in<br />

Nepal and Bhutan. The corporation is also diversifying towards small hydro sector and<br />

proposal has been submitted to Government on this account.<br />

11.2.7 CONSERVATION OF ENERGY<br />

NHPC is taking active part in the Energy Conservation programme <strong>of</strong> the Government<br />

and has set up an In house committee which reviews the efforts taken by the corporation<br />

for Energy Conservation activities from time to time.<br />

11.2.8 PROJECT INVESTIGATION<br />

N.H.P.C. completed investigation <strong>of</strong> a good number <strong>of</strong> hydro-power projects including<br />

Dulhasti, Koel Karo, Tanakpur, Chamera, Teesta (stage-V), Dhaleshwari, different stages<br />

<strong>of</strong> Dhauliganga, Goriganga and Kishanganga etc., in the central sector, and submitted<br />

feasibility/detail project report. Identification <strong>of</strong> few more such project investigation<br />

schemes are in process.<br />