PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
upgrade the technology. Active inter-action and liaison with the Bureau <strong>of</strong> Indian<br />
Standards are being maintained through participation in and deliberation <strong>of</strong> various<br />
technological committees involved with the formation and revision <strong>of</strong> guidelines for<br />
various structures/elements <strong>of</strong> hydro power projects etc. As part <strong>of</strong> its efforts in the<br />
field <strong>of</strong> Research & Development a separate division “Research Development” has<br />
been created to look after the problems relating to silt at various operational projects<br />
and import substitution <strong>of</strong> spares.<br />
A post construction Environmental Impact Assessment has been conducted in Chamera<br />
stage - I project through Satellite Remote Sensing Data processing and through<br />
Geographical Information system.<br />
11.2.6 CONSULTANCY SERVICES<br />
With a view to encash the vast experience and expertise gained by the corporation over<br />
the last 20 years, in the investigation, design, construction and operation <strong>of</strong> Hydro<br />
<strong>Power</strong> Projects, the Corporation has set up a Consultancy wing. During the year 1<strong>99</strong>7-<br />
98 the Corporation has got fresh consultancy assignments from Northern Railway,<br />
THDC, NJPC, NCB, KSEB APSEB, CWC and JKPDCC. Negotiations are in the<br />
pipeline with Border Roads Organisation (BRO), West Bengal <strong>Power</strong> Development<br />
Corporation Ltd. (WBPDCL) and Shree Maheshwar <strong>Power</strong> Corporation. The<br />
consultancy work is gaining more and more importance and NHPC is also negotiating<br />
with foreign companies for Tuirial H.E.Project, Mizoram and some other projects in<br />
Nepal and Bhutan. The corporation is also diversifying towards small hydro sector and<br />
proposal has been submitted to Government on this account.<br />
11.2.7 CONSERVATION OF ENERGY<br />
NHPC is taking active part in the Energy Conservation programme <strong>of</strong> the Government<br />
and has set up an In house committee which reviews the efforts taken by the corporation<br />
for Energy Conservation activities from time to time.<br />
11.2.8 PROJECT INVESTIGATION<br />
N.H.P.C. completed investigation <strong>of</strong> a good number <strong>of</strong> hydro-power projects including<br />
Dulhasti, Koel Karo, Tanakpur, Chamera, Teesta (stage-V), Dhaleshwari, different stages<br />
<strong>of</strong> Dhauliganga, Goriganga and Kishanganga etc., in the central sector, and submitted<br />
feasibility/detail project report. Identification <strong>of</strong> few more such project investigation<br />
schemes are in process.<br />
85