PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
PERFORMANCE BUDGET 1998-99 - Ministry of Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1. PUBLIC SECTOR UNDERTAKINGS:<br />
i) National Thermal <strong>Power</strong> Corporation (NTPC), New Delhi;<br />
ii) National Hydro-electric <strong>Power</strong> Corporation (NHPC), Faridabad;<br />
iii) North-Eastern Electric <strong>Power</strong> Corporation (NEEPCO), Shillong;<br />
iv) <strong>Power</strong> Finance Corporation (PFC), New Delhi,<br />
v) <strong>Power</strong> Grid Corporation <strong>of</strong> India Ltd. (PGCIL), New Delhi, and<br />
vi) Rural Electrification Corporation (REC), New Delhi;<br />
2. JOINT VENTURE CORPORATIONS:<br />
i) Nathpa Jhakri <strong>Power</strong> Corporation (NJPC), Shimla and<br />
ii) Tehri Hydro Development Corporation (THDC), Noida (UP)<br />
3. STATUTORY BODIES:<br />
i) Damodar Valley Corporation (DVC), Calcutta, and<br />
ii) Bhakra Beas Management Board (BBMB), Chandigarh.<br />
A brief description <strong>of</strong> these corporations and their activities are indicated in the<br />
succeeding paras:<br />
11.1. NATIONAL THERMAL POWER CORPORATION LIMITED (NTPC):<br />
11.1.1 NTPC was set up in 1975 as a Central Sector generating company for the development <strong>of</strong><br />
thermal power. The corporation is at present engaged in operating/setting up thirteen (13)<br />
thermal power projects and six (6) gas based power projects. Out <strong>of</strong> the total approved<br />
capacity <strong>of</strong> 20465 MW, NTPC has already commissioned 16795 MW and has planned a<br />
capacity addition <strong>of</strong> 115 MW during <strong>1<strong>99</strong>8</strong>-<strong>99</strong>. The details <strong>of</strong> generating capacity <strong>of</strong> 16795<br />
MW already commissioned and under operation is as under:<br />
11.1.2 Installed Capacity as on 31.3.<strong>1<strong>99</strong>8</strong>:<br />
S.No. Project Region Capacity (MW)<br />
1. Singrauli Northern 2000<br />
2. Korba Western 2100<br />
3. Ramagundam Southern 2100<br />
4. Farakka Eastern 1600<br />
5. Vindhyachal-I Western 1260<br />
6. Rihand Northern 1000<br />
7. Anta Northern 413<br />
8. Auraiya Northern 652<br />
9. Kawas Western 645<br />
10. Kahalgaon Eastern 840<br />
78