04.08.2013 Views

PERFORMANCE BUDGET 1998-99 - Ministry of Power

PERFORMANCE BUDGET 1998-99 - Ministry of Power

PERFORMANCE BUDGET 1998-99 - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. PUBLIC SECTOR UNDERTAKINGS:<br />

i) National Thermal <strong>Power</strong> Corporation (NTPC), New Delhi;<br />

ii) National Hydro-electric <strong>Power</strong> Corporation (NHPC), Faridabad;<br />

iii) North-Eastern Electric <strong>Power</strong> Corporation (NEEPCO), Shillong;<br />

iv) <strong>Power</strong> Finance Corporation (PFC), New Delhi,<br />

v) <strong>Power</strong> Grid Corporation <strong>of</strong> India Ltd. (PGCIL), New Delhi, and<br />

vi) Rural Electrification Corporation (REC), New Delhi;<br />

2. JOINT VENTURE CORPORATIONS:<br />

i) Nathpa Jhakri <strong>Power</strong> Corporation (NJPC), Shimla and<br />

ii) Tehri Hydro Development Corporation (THDC), Noida (UP)<br />

3. STATUTORY BODIES:<br />

i) Damodar Valley Corporation (DVC), Calcutta, and<br />

ii) Bhakra Beas Management Board (BBMB), Chandigarh.<br />

A brief description <strong>of</strong> these corporations and their activities are indicated in the<br />

succeeding paras:<br />

11.1. NATIONAL THERMAL POWER CORPORATION LIMITED (NTPC):<br />

11.1.1 NTPC was set up in 1975 as a Central Sector generating company for the development <strong>of</strong><br />

thermal power. The corporation is at present engaged in operating/setting up thirteen (13)<br />

thermal power projects and six (6) gas based power projects. Out <strong>of</strong> the total approved<br />

capacity <strong>of</strong> 20465 MW, NTPC has already commissioned 16795 MW and has planned a<br />

capacity addition <strong>of</strong> 115 MW during <strong>1<strong>99</strong>8</strong>-<strong>99</strong>. The details <strong>of</strong> generating capacity <strong>of</strong> 16795<br />

MW already commissioned and under operation is as under:<br />

11.1.2 Installed Capacity as on 31.3.<strong>1<strong>99</strong>8</strong>:<br />

S.No. Project Region Capacity (MW)<br />

1. Singrauli Northern 2000<br />

2. Korba Western 2100<br />

3. Ramagundam Southern 2100<br />

4. Farakka Eastern 1600<br />

5. Vindhyachal-I Western 1260<br />

6. Rihand Northern 1000<br />

7. Anta Northern 413<br />

8. Auraiya Northern 652<br />

9. Kawas Western 645<br />

10. Kahalgaon Eastern 840<br />

78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!