11.2.9 <strong>PERFORMANCE</strong> AGAINST MEMORANDUM OF UNDERSTANDING<br />

Memorandum <strong>of</strong> Understanding was signed in 1<strong>99</strong>6-97 between N.H.P.C. and the<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> setting targets <strong>of</strong> different performances parameters such as<br />

Generation, Machine Availability, Financial parameters <strong>of</strong> Gross Margin and Net Pr<strong>of</strong>it<br />

as percentage <strong>of</strong> Capital employed, achievement <strong>of</strong> project implementation milestones,<br />

completion <strong>of</strong> tariff agreement with beneficiaries, rehabilitation <strong>of</strong> affected persons,<br />

HRD Programme etc. Actual performances <strong>of</strong> the corporation exceeded the targets in a<br />

number <strong>of</strong> cases and overall performances <strong>of</strong> it is rated EXCELLENT. The targets for<br />

performance rating and actual achievements are shown in the statement enclosed at<br />

Annexure - V.<br />

11.3 NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED<br />

11.3.1 The North Eastern Electric <strong>Power</strong> Corporation (NEEPCO) was registered as a company<br />

under the Companies Act,1956 on 2nd April,1976 with the objective to develop in all its<br />

aspects, electric power in the North Eastern region, formulation <strong>of</strong> regional policy for the<br />

development <strong>of</strong> electric power stations and projects, transmission, distribution and sale <strong>of</strong><br />

electric power. The Corporation has achieved a total installed capacity <strong>of</strong> 451 MW (under<br />

operation) comprising 150 MW from Kopili HEP, 100 MW from Kopili HEP I stage Extension<br />

and 201 MW from Assam Gas Based Combined Cycle Project.<br />

11.3.2 The Kopili HE project (150 MW) achieved a total generation <strong>of</strong> 447.17 million units during<br />

1<strong>99</strong>7-98 against the target <strong>of</strong> 806 million units. The generation was less due to shutting down<br />

<strong>of</strong> Unit No. 1 from 4.12.96 to 31.12.97 due to stator earth fault and low water level. Further,<br />

two units <strong>of</strong> 50 MW each <strong>of</strong> Kopili HE project 1st stage extension was synchronised on<br />

5.3.97 and 29.3.97 respectively. The generation from these two units during 1<strong>99</strong>7-98 was<br />

367.40 MUs against the target <strong>of</strong> 306 MUs. The actual generation from Assam Gas Based<br />

Combined Cycle Project during 1<strong>99</strong>7-98 was 702.62 MUs against the target <strong>of</strong> 600 MUs.<br />

11.3.3 The Corporation is presently executing the following projects in the North Eastern<br />

region:<br />

Generation Projects:<br />

1. Doyang H.E. Project (75 MW) - Nagaland<br />

2. Ranganadi HE Project (405 MW) - Stage-I - Arunachal Pradesh<br />

3. Assam Gas Based Combined Cycle <strong>Power</strong> Project (291 MW) at Kathalguri, Assam<br />

(upto March,’98, 6 GT units <strong>of</strong> 33.5 MW each And 2 ST units <strong>of</strong> 30 MW each<br />

have since been commissioned)<br />