Unit Description Scheduled date <strong>of</strong> commissioning<br />

GT I March 2000<br />

GT II May 2000<br />

ST I March 2001<br />

The entire power generated by this project shall be supplied to Kerala State as per<br />

power purchase agreement executed between NTPC and KSEB.<br />

2.4 Faridabad Gas <strong>Power</strong> Project (400 MW)<br />

The project which is being set up near Mujheri Village adjacent to Faridabad city in<br />

Haryana, has been approved by Govt. <strong>of</strong> India on 8.7.1<strong>99</strong>7 at the estimated cost <strong>of</strong><br />

Rs.1163.60 crore and will have three units comprising <strong>of</strong> two units <strong>of</strong> Gas turbines and<br />

one unit <strong>of</strong> Steam turbine. Gas will be the primary fuel for which an agreement has<br />

already been signed with GAIL on 29.12.95. The project shall be financed through<br />

Japanese Yen loan from OECF, Japan routed through budget.<br />

Award for main plant <strong>of</strong> this project for which OECF concurrence was received in<br />

December 1<strong>99</strong>7, has been awarded on 09.01.98.<br />

The total land required for the project has been acquired. The site levelling work in<br />

main plant area has already been completed. Balance site levelling work is progressing<br />

as per schedule. Other infrastructural work are progressing as per schedule. The<br />

scheduled commissioning <strong>of</strong> various units is as under:<br />

Unit Description Scheduled date <strong>of</strong> commissioning<br />

GT I January 2000<br />

GT II March 2000<br />

ST I January 2001<br />

The entire power generated by this project will be supplied to Haryana State as per<br />

power purchase agreement signed between NTPC and HSEB (Haryana State Electricity<br />

Board).<br />

2.5 Simhadri TPP (2x500 MW)<br />

The project which has been approved by the Govt. <strong>of</strong> India on 8.7.1<strong>99</strong>7 at an estimated<br />

cost <strong>of</strong> Rs.3650.79 crore, is being set up near Pittavanipalam Village, Dist.<br />

Vishakhapatnam in the State <strong>of</strong> Andhra Pradesh. The project comprising <strong>of</strong> two units<br />

<strong>of</strong> 500 MW each shall be financed from OECF, Japan.<br />