(iv) The R&D project on Statcon Dynamic Voltage Restorer, sanctioned in October,<br />

1<strong>99</strong>5 for contribution <strong>of</strong> Rs.12 lakh (against the total cost <strong>of</strong> Rs.30.79 lakh) is<br />

under implementation by IIT, Delhi. The project is scheduled for completion in a<br />

period <strong>of</strong> two years.<br />

10.4 Demand Side Energy Conservation<br />

10.4.1 Demonstration/Training Projects relating to Agriculture Sector<br />

(i) The project for rectification <strong>of</strong> 1350 agricultural pumpsets in Punjab was<br />

sanctioned in June, 1<strong>99</strong>1 for contribution <strong>of</strong> Rs. 19.31 lakh. An amount <strong>of</strong> Rs.3.86<br />

lakh had already been relesed to PSEB till March, 1<strong>99</strong>6. It was subsequently decided<br />

to increase the scope <strong>of</strong> the project to 2970 pumpsets by contributing the rectification<br />

cost over and above Rs.650 per pumpset. Till date, the PSEB has completed rectification<br />

<strong>of</strong> 365 pumpsets. Now, it has been decided to close the project.<br />

(ii) A project for rectification <strong>of</strong> 800 agricultural pumpsets in Haryana, sanctioned in<br />

March, 1<strong>99</strong>5 for contribution <strong>of</strong> Rs.11 lakh (50% <strong>of</strong> the total cost) is under<br />

implementation through the Haryana State Council <strong>of</strong> Science & Technology<br />

(HSCST), Chandigarh. The completion <strong>of</strong> the project has been delayed beyond<br />

the scheduled period <strong>of</strong> 1 year.<br />

(iii) A project for rectification <strong>of</strong> 5000 agricultural pumpsets in Gujarat, sanctioned<br />

in March, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs. 75 lakh (50% <strong>of</strong> the total cost), is under<br />

implementation by the Gujarat Electricity Board. The project is expected to be<br />

completed by June, <strong>1<strong>99</strong>8</strong>.<br />

(iv) A project for replacement <strong>of</strong> footvalves in 20,000 agricultural pumpsets in Andhra<br />

Pradesh, sanctioned in March, 1<strong>99</strong>5 at a cost <strong>of</strong> Rs.48 lakh, is under<br />

implementation by the Andhra Pradesh State Council <strong>of</strong> Science & Technology<br />

(APCOST), Hyderabad. The project was scheduled to be completed in a period<br />

<strong>of</strong> two years. It has been decided to complete the project by March, <strong>1<strong>99</strong>8</strong> with the<br />

reduced scope <strong>of</strong> replacement <strong>of</strong> footvalves in 7,000 pumpsets with the amount<br />

<strong>of</strong> Rs.10 lakh already available with APCOST and refund the balance amount <strong>of</strong><br />

Rs.38 lakh available with EMC to GOI (MOP).<br />

(v) A project to set up five demonstration centres on energy efficient electric lift<br />

irrigation pumping system, sanctioned in March, 1<strong>99</strong>4 at a cost <strong>of</strong> Rs.9.75 lakh,<br />

is under implementation by Andhra Pradesh Productivity Council (APPC).<br />

74