(iv) The R&D project on Statcon Dynamic Voltage Restorer, sanctioned in October,<br />
1<strong>99</strong>5 for contribution <strong>of</strong> Rs.12 lakh (against the total cost <strong>of</strong> Rs.30.79 lakh) is<br />
under implementation by IIT, Delhi. The project is scheduled for completion in a<br />
period <strong>of</strong> two years.<br />
10.4 Demand Side Energy Conservation<br />
10.4.1 Demonstration/Training Projects relating to Agriculture Sector<br />
(i) The project for rectification <strong>of</strong> 1350 agricultural pumpsets in Punjab was<br />
sanctioned in June, 1<strong>99</strong>1 for contribution <strong>of</strong> Rs. 19.31 lakh. An amount <strong>of</strong> Rs.3.86<br />
lakh had already been relesed to PSEB till March, 1<strong>99</strong>6. It was subsequently decided<br />
to increase the scope <strong>of</strong> the project to 2970 pumpsets by contributing the rectification<br />
cost over and above Rs.650 per pumpset. Till date, the PSEB has completed rectification<br />
<strong>of</strong> 365 pumpsets. Now, it has been decided to close the project.<br />
(ii) A project for rectification <strong>of</strong> 800 agricultural pumpsets in Haryana, sanctioned in<br />
March, 1<strong>99</strong>5 for contribution <strong>of</strong> Rs.11 lakh (50% <strong>of</strong> the total cost) is under<br />
implementation through the Haryana State Council <strong>of</strong> Science & Technology<br />
(HSCST), Chandigarh. The completion <strong>of</strong> the project has been delayed beyond<br />
the scheduled period <strong>of</strong> 1 year.<br />
(iii) A project for rectification <strong>of</strong> 5000 agricultural pumpsets in Gujarat, sanctioned<br />
in March, 1<strong>99</strong>6 for contribution <strong>of</strong> Rs. 75 lakh (50% <strong>of</strong> the total cost), is under<br />
implementation by the Gujarat Electricity Board. The project is expected to be<br />
completed by June, <strong>1<strong>99</strong>8</strong>.<br />
(iv) A project for replacement <strong>of</strong> footvalves in 20,000 agricultural pumpsets in Andhra<br />
Pradesh, sanctioned in March, 1<strong>99</strong>5 at a cost <strong>of</strong> Rs.48 lakh, is under<br />
implementation by the Andhra Pradesh State Council <strong>of</strong> Science & Technology<br />
(APCOST), Hyderabad. The project was scheduled to be completed in a period<br />
<strong>of</strong> two years. It has been decided to complete the project by March, <strong>1<strong>99</strong>8</strong> with the<br />
reduced scope <strong>of</strong> replacement <strong>of</strong> footvalves in 7,000 pumpsets with the amount<br />
<strong>of</strong> Rs.10 lakh already available with APCOST and refund the balance amount <strong>of</strong><br />
Rs.38 lakh available with EMC to GOI (MOP).<br />
(v) A project to set up five demonstration centres on energy efficient electric lift<br />
irrigation pumping system, sanctioned in March, 1<strong>99</strong>4 at a cost <strong>of</strong> Rs.9.75 lakh,<br />
is under implementation by Andhra Pradesh Productivity Council (APPC).<br />