esponsible for overall coordination and extensive monitoring <strong>of</strong> the implementation<br />
<strong>of</strong> physical and financial programme <strong>of</strong> R&M Schemes covered under the programme<br />
by visiting different Thermal <strong>Power</strong> Stations and manufacturer like BHEL, ILK etc.<br />
Encouraged from the results achieved from R & M Programme (Phase-I), R & M<br />
Programme (Phase-II) has been taken up in 1<strong>99</strong>1 for implementation during the 8th<br />
Plan. Under the programme 44 nos. <strong>of</strong> Thermal <strong>Power</strong> Stations consisting <strong>of</strong> 198 Thermal<br />
units and 55 schemes in Hydro <strong>Power</strong> Stations have been covered. The physical targets<br />
and achievement during 8 th Plan are as under:<br />
Activities/targets Achievement<br />
R&M activities 1629 R&M activities 709 R&M activities.<br />
Balance are under progress.<br />
Additional }<br />
Generation <strong>of</strong> } 7000 MU/year 10000 MU/year<br />
Electricity } (increase <strong>of</strong> 142.85%)<br />
2.6.2 The role <strong>of</strong> CEA in R & M Schemes during the 9 th Five Year Plan is going to be enhanced<br />
considerably as life extension proposals are expected to be received for older Units and<br />
proposals <strong>of</strong> Private Sector participation in R&M would start coming to CEA for concurrence<br />
under Electricity Act. It is estimated that R & M works costing more than Rs.8800 crore are<br />
likely to be implemented during 9 th Plan Period.<br />
2.6.3 For discharging these responsibilities, financial requirements for the personnel engaged for<br />
this activity (wholly Plan) is as under:<br />
35<br />
(Rs. in lakhs)<br />
Actual 1<strong>99</strong>6-97 B.E. 1<strong>99</strong>7-98 R.E.1<strong>99</strong>7-98 B.E. <strong>1<strong>99</strong>8</strong>-<strong>99</strong><br />
75.49 91.00 157.00 170.00<br />
2.7 Electronic Data Processing & Support System<br />
2.7.1 The scheme was formulated keeping in view the requirements for the operation and maintenance<br />
<strong>of</strong> electric data processing facilities in CEA. It has not only helped in improving the quality but<br />
has also brought in more effciency in the working <strong>of</strong> CEA. The work <strong>of</strong> setting up <strong>of</strong> computer<br />
centre has since been completed. The funds allocated is being utilised for the recurring<br />
expenditure towards the operation and maintenance <strong>of</strong> computers, procurement <strong>of</strong> consumables<br />
for the same and consumable for other related items <strong>of</strong> <strong>of</strong>fice automation.