18.08.2013 Views

ClearPath OS 2200 Series Release 13.2 Software Planning and ...

ClearPath OS 2200 Series Release 13.2 Software Planning and ...

ClearPath OS 2200 Series Release 13.2 Software Planning and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Exec Considerations<br />

• The Audit Trail Descriptor (ATD) version has been increased to 021 due to<br />

reformatting changes in the ATD. This version change will force ALL audit trails on<br />

the system to be closed on the initial crossboot to this EXEC level. The following<br />

message will be displayed for each configured audit trail:<br />

AT n *VERSION MISMATCH: ARF – 0xx EXEC – 021*<br />

where n is the trail number <strong>and</strong> xx is the version number recovered from the ARF<br />

(from the previous EXEC level). These audit trails will then be recovered from the<br />

MCT to a closed state. This will force all Stepcontrol applications to do an SUTIL<br />

recovery (PANIC <strong>and</strong> REBUILD recovery options will not be possible).<br />

4.1.5. LIBSAVE/LIBLOAD Scenario<br />

Communications Platform for Open Systems (CPComm<strong>OS</strong>) is a new communications<br />

product introduced with <strong>ClearPath</strong> Dorado 400 <strong>and</strong> 4000/4100/4200 Server systems.<br />

Dorado 300, 700, <strong>and</strong> 800 Server systems continue to use the CPComm<br />

communications product.<br />

To perform a LIBLOAD between a Dorado 300, 700, or 800 Server system <strong>and</strong> a<br />

<strong>ClearPath</strong> Dorado 400, 4000, 4100, or 4200 Server system, the correct communications<br />

product must be installed after the LIBLOAD is completed. See PLE 18483131 for<br />

required CPComm changes.<br />

To install the applicable communications product, perform the following steps:<br />

1. Perform LIBSAVE on system A.<br />

2. Perform LIBLOAD on system B.<br />

3. Use SOLAR to register the system B software product key tape.<br />

4. Install the correct communications product on system B.<br />

• CPComm for Dorado 300, 700, <strong>and</strong> 800 systems is on package tape<br />

CP-COMMSUITE.<br />

• CPComm<strong>OS</strong> for Dorado 400, 4000, 4100, <strong>and</strong> 4200 Server systems is on<br />

package tape CP-COMMSUITE.<br />

Note: The communications configuration file is not included in the LIBSAV.<br />

4.1.6. I/O COMMAND QUEUING (IOCQ)<br />

I/O Comm<strong>and</strong> Queuing (IOCQ) can greatly improve disk performance. IOCQ allows<br />

multiple I/Os to be performed on the same logical disk at the same time. This can reduce<br />

the amount of queuing <strong>and</strong> the time needed to complete I/Os, which reduces the I/O<br />

existence time, <strong>and</strong> potentially, overall transaction existence time.<br />

Prior to IOCQ, the <strong>OS</strong> <strong>2200</strong> allowed only one I/O to be active to a logical disk. If an I/O<br />

was active to a logical disk, any subsequent I/Os were queued in <strong>OS</strong> <strong>2200</strong> until the<br />

active I/O completed.<br />

4–6 7831 0349–043

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!