23.03.2014 Views

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>18</strong> July <strong>2006</strong> 3 / 59<br />

15 TO 19 TURRAMURRA AVENUE AND 1 TO<br />

1A WONGA WONGA STREET, TURRAMURRA<br />

Item 3<br />

DA0068/06<br />

7 July <strong>2006</strong><br />

107. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> site and prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong><br />

Certificate, qualified practiti<strong>on</strong>ers must undertake a closed circuit televisi<strong>on</strong> (CCTV)<br />

inspecti<strong>on</strong> and then report <strong>on</strong> the existing c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Council drainage pipeline traversing<br />

the subject property. The report must <str<strong>on</strong>g>be</str<strong>on</strong>g> provided <str<strong>on</strong>g>to</str<strong>on</strong>g> Council, attenti<strong>on</strong> Development<br />

Engineer, prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certificate. The report is <str<strong>on</strong>g>to</str<strong>on</strong>g> include a copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

video footage <str<strong>on</strong>g>of</str<strong>on</strong>g> the pipeline.<br />

108. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any excavati<strong>on</strong> works <strong>on</strong> site the Applicant must submit, for<br />

approval by the Principal Certifying Authority (with a copy forwarded <str<strong>on</strong>g>to</str<strong>on</strong>g> Council) a full<br />

dilapidati<strong>on</strong> report <strong>on</strong> the visible and structural c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> structures at 2 Nulla Nulla Street<br />

and 3 W<strong>on</strong>ga W<strong>on</strong>ga Street (including the tennis court). The report must <str<strong>on</strong>g>be</str<strong>on</strong>g> completed by a<br />

c<strong>on</strong>sulting structural/geotechnical engineer. Up<strong>on</strong> submitting a copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the dilapidati<strong>on</strong><br />

report <str<strong>on</strong>g>to</str<strong>on</strong>g> Council (or certificati<strong>on</strong> that no report is required), a written acknowledgment from<br />

Council development engineers shall <str<strong>on</strong>g>be</str<strong>on</strong>g> obtained (attesting <str<strong>on</strong>g>to</str<strong>on</strong>g> this c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>be</str<strong>on</strong>g>ing<br />

appropriately satisfied) and submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying Authority prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the<br />

commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> site.<br />

109. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> site the applicant must submit, for review by<br />

Council Engineers, a C<strong>on</strong>structi<strong>on</strong> and Traffic Management Plan. The following matters must<br />

<str<strong>on</strong>g>be</str<strong>on</strong>g> specifically addressed in the Plan:<br />

1. A plan view <str<strong>on</strong>g>of</str<strong>on</strong>g> the entire site and fr<strong>on</strong>tage roadways indicating:<br />

- Dedicated c<strong>on</strong>structi<strong>on</strong> site entrances and exits, c<strong>on</strong>trolled by a certified traffic<br />

c<strong>on</strong>troller, <str<strong>on</strong>g>to</str<strong>on</strong>g> safely manage pedestrians and c<strong>on</strong>structi<strong>on</strong> related vehicles in the<br />

fr<strong>on</strong>tage roadways,<br />

- Turning areas within the site for c<strong>on</strong>structi<strong>on</strong> and spoil removal vehicles, allowing<br />

a forward egress for all c<strong>on</strong>structi<strong>on</strong> vehicles <strong>on</strong> the site,<br />

- The locati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed Work Z<strong>on</strong>es in the fr<strong>on</strong>tage roadways,<br />

- Locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any proposed crane standing areas<br />

- A dedicated unloading and loading point within the site for all c<strong>on</strong>structi<strong>on</strong><br />

vehicles, plant and deliveries<br />

- Material, plant and spoil bin s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage areas within the site, where all materials are<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> dropped <str<strong>on</strong>g>of</str<strong>on</strong>g>f and collected.<br />

- The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> an <strong>on</strong>-site parking area for employees, tradespers<strong>on</strong> and<br />

c<strong>on</strong>structi<strong>on</strong> vehicles as far as possible<br />

2. Traffic C<strong>on</strong>trol Plan(s) for the site<br />

- All traffic c<strong>on</strong>trol devices installed in the road reserve must <str<strong>on</strong>g>be</str<strong>on</strong>g> in accordance with<br />

the RTA publicati<strong>on</strong> “Traffic C<strong>on</strong>trol Worksite Manual” and <str<strong>on</strong>g>be</str<strong>on</strong>g> designed by a<br />

pers<strong>on</strong> licensed <str<strong>on</strong>g>to</str<strong>on</strong>g> do so (minimum RTA ‘red card’ qualificati<strong>on</strong>). The main<br />

stages <str<strong>on</strong>g>of</str<strong>on</strong>g> the development requiring specific c<strong>on</strong>structi<strong>on</strong> management measures<br />

are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> identified and specific traffic c<strong>on</strong>trol measures identified for each.<br />

- Pedestrian access al<strong>on</strong>g the site fr<strong>on</strong>tage during footpath closure is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> provided<br />

by water-filled barriers.<br />

- Approval is <str<strong>on</strong>g>to</str<strong>on</strong>g> obtained from Ku-ring-gai Council for any temporary road closures<br />

or crane use from public property.<br />

N:\0607<strong>18</strong>-OMC-PR-03482-15 TO 19 TURRAMURRA AVENU.doc/murphy/59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!