23.03.2014 Views

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>18</strong> July <strong>2006</strong> 3 / 60<br />

15 TO 19 TURRAMURRA AVENUE AND 1 TO<br />

1A WONGA WONGA STREET, TURRAMURRA<br />

Item 3<br />

DA0068/06<br />

7 July <strong>2006</strong><br />

3. A detailed descripti<strong>on</strong> and route map <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed route for vehicles involved in<br />

spoil removal, material delivery and machine floatage must <str<strong>on</strong>g>be</str<strong>on</strong>g> provided. During<br />

the course <str<strong>on</strong>g>of</str<strong>on</strong>g> the works, the route is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> signposted. Routes for c<strong>on</strong>structi<strong>on</strong><br />

vehicles travelling north are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> indicated.<br />

- Light traffic roads and those subject <str<strong>on</strong>g>to</str<strong>on</strong>g> a load or height limit must <str<strong>on</strong>g>be</str<strong>on</strong>g> avoided at all<br />

times.<br />

- A copy <str<strong>on</strong>g>of</str<strong>on</strong>g> this route is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> made available <str<strong>on</strong>g>to</str<strong>on</strong>g> all c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs, and shall <str<strong>on</strong>g>be</str<strong>on</strong>g> clearly<br />

depicted at a locati<strong>on</strong> within the site.<br />

In additi<strong>on</strong>, the plan must address:<br />

- Evidence <str<strong>on</strong>g>of</str<strong>on</strong>g> RTA c<strong>on</strong>currence where c<strong>on</strong>structi<strong>on</strong> access is provided directly or<br />

within 20m <str<strong>on</strong>g>of</str<strong>on</strong>g> an Arterial Rd.<br />

- A schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> site inducti<strong>on</strong>s <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> regular occasi<strong>on</strong>s and as determined<br />

necessary <str<strong>on</strong>g>to</str<strong>on</strong>g> ensure all new employees are aware <str<strong>on</strong>g>of</str<strong>on</strong>g> the c<strong>on</strong>structi<strong>on</strong> management<br />

obligati<strong>on</strong>s. These must specify that c<strong>on</strong>structi<strong>on</strong>-related vehicles <str<strong>on</strong>g>to</str<strong>on</strong>g> comply with<br />

the approved requirements.<br />

- Minimising c<strong>on</strong>structi<strong>on</strong> related traffic movements during school peak periods.<br />

- The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> an <strong>on</strong>-site parking area for employees, tradespers<strong>on</strong> and<br />

c<strong>on</strong>structi<strong>on</strong> vehicles as far as possible and if not possible, an estimate <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

num<str<strong>on</strong>g>be</str<strong>on</strong>g>r <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>- street parking spaces necessary and an alternative legal <strong>on</strong>-street<br />

locati<strong>on</strong> for employee parking.<br />

The C<strong>on</strong>structi<strong>on</strong> and Traffic Management Plan shall <str<strong>on</strong>g>be</str<strong>on</strong>g> prepared by a suitably qualified and<br />

experienced traffic c<strong>on</strong>sultant and <str<strong>on</strong>g>be</str<strong>on</strong>g> certified by this pers<strong>on</strong> as <str<strong>on</strong>g>be</str<strong>on</strong>g>ing in accordance with the<br />

requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> the abovementi<strong>on</strong>ed documents and the requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> this c<strong>on</strong>diti<strong>on</strong>. The<br />

c<strong>on</strong>structi<strong>on</strong> management measures c<strong>on</strong>tained in the approved plan shall <str<strong>on</strong>g>be</str<strong>on</strong>g> implemented in<br />

accordance with the plan prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g>, and during, works <strong>on</strong>-site including<br />

excavati<strong>on</strong>. As the plan has a direct impact <strong>on</strong> the local road network, the plan shall <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> and reviewed by Council, attenti<strong>on</strong> Development Engineer. A written<br />

acknowledgment from Council engineers shall <str<strong>on</strong>g>be</str<strong>on</strong>g> obtained (attesting <str<strong>on</strong>g>to</str<strong>on</strong>g> this c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>be</str<strong>on</strong>g>ing<br />

appropriately satisfied) and submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying Authority prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the<br />

commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> site. A fee is payable for the assessment <str<strong>on</strong>g>of</str<strong>on</strong>g> the plan by Kuring-gai<br />

Council.<br />

110. If a Works Z<strong>on</strong>e is proposed, the Applicant must make a written applicati<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> the Ku-ringgai<br />

Local Traffic Committee <str<strong>on</strong>g>to</str<strong>on</strong>g> install the ‘Work Z<strong>on</strong>e’. The applicati<strong>on</strong> must <str<strong>on</strong>g>be</str<strong>on</strong>g> made at<br />

least 15 days prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> site approved under this c<strong>on</strong>sent.<br />

Works Z<strong>on</strong>es are provided specifically for the set down and pick up <str<strong>on</strong>g>of</str<strong>on</strong>g> materials and not for<br />

the parking <str<strong>on</strong>g>of</str<strong>on</strong>g> private vehicles associated with the site. Works Z<strong>on</strong>es will generally not <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

approved where there is sufficient space <strong>on</strong>-site for the setting down and picking up <str<strong>on</strong>g>of</str<strong>on</strong>g> goods<br />

<str<strong>on</strong>g>be</str<strong>on</strong>g>ing taken <str<strong>on</strong>g>to</str<strong>on</strong>g> or from a c<strong>on</strong>structi<strong>on</strong> site. If the Works Z<strong>on</strong>e is approved by the Committee,<br />

the Applicant must obtain a written copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the related resoluti<strong>on</strong> from the Ku-ring-gai Local<br />

Traffic Committee and submit a copy <str<strong>on</strong>g>of</str<strong>on</strong>g> this <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying Authority for<br />

approval prior <str<strong>on</strong>g>to</str<strong>on</strong>g> commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> the site. Where approval <str<strong>on</strong>g>of</str<strong>on</strong>g> the ‘Work<br />

Z<strong>on</strong>e’ is resolved by the Committee, the necessary ‘Work Z<strong>on</strong>e’ signage shall <str<strong>on</strong>g>be</str<strong>on</strong>g> installed (at<br />

N:\0607<strong>18</strong>-OMC-PR-03482-15 TO 19 TURRAMURRA AVENU.doc/murphy/60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!