Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>18</strong> July <strong>2006</strong> 3 / 62<br />

15 TO 19 TURRAMURRA AVENUE AND 1 TO<br />

1A WONGA WONGA STREET, TURRAMURRA<br />

Item 3<br />

DA0068/06<br />

7 July <strong>2006</strong><br />

Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> Occupati<strong>on</strong> Certificate issue<br />

113. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the release <str<strong>on</strong>g>of</str<strong>on</strong>g> any occupati<strong>on</strong> certificate, a compliance certificate must <str<strong>on</strong>g>be</str<strong>on</strong>g> obtained<br />

from an accredited certifier, certifying that the building works for the building <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> occupied<br />

comply with the plans and specificati<strong>on</strong>s approved by this development c<strong>on</strong>sent; and any<br />

c<strong>on</strong>structi<strong>on</strong> certificate associated with this c<strong>on</strong>sent for the buildings <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> occupied. If the<br />

PCA is not the Council, then this compliance certificate must <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Council at<br />

the same time as the occupati<strong>on</strong> certificate is submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Council in accordance with<br />

Clause 151(2) <str<strong>on</strong>g>of</str<strong>on</strong>g> the EP & A Act regulati<strong>on</strong>s.<br />

114. To ensure compliance with the c<strong>on</strong>sent, a final report from a Registered Surveyor shall <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> Council c<strong>on</strong>firming floor/ ceiling levels and boundary setbacks prior <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

occupati<strong>on</strong>.<br />

115. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> occupati<strong>on</strong>, issue <str<strong>on</strong>g>of</str<strong>on</strong>g> an Occupati<strong>on</strong> Certificate or issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Final Compliance<br />

Certificate, the Secti<strong>on</strong> 73 Sydney Water compliance certificate must <str<strong>on</strong>g>be</str<strong>on</strong>g> obtained and<br />

submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying Authority (PCA).<br />

116. The trees <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> retained shall <str<strong>on</strong>g>be</str<strong>on</strong>g> inspected, m<strong>on</strong>i<str<strong>on</strong>g>to</str<strong>on</strong>g>red and treated when necessary by a<br />

qualified Arborist <str<strong>on</strong>g>be</str<strong>on</strong>g>fore, during and after completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> development works <str<strong>on</strong>g>to</str<strong>on</strong>g> ensure their<br />

l<strong>on</strong>g term survival. Inspecti<strong>on</strong>s by and documentati<strong>on</strong> from the Arborist <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal<br />

Certifying Authority is required as specified. Documentary evidence <str<strong>on</strong>g>of</str<strong>on</strong>g> compliance with this<br />

c<strong>on</strong>diti<strong>on</strong> shall <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying Authority prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

Occupati<strong>on</strong> Certificate.<br />

117. The landscape works, shall <str<strong>on</strong>g>be</str<strong>on</strong>g> installed in accordance with the approved plan/s and/ or<br />

c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>sent, <str<strong>on</strong>g>be</str<strong>on</strong>g> completed prior <str<strong>on</strong>g>to</str<strong>on</strong>g> release <str<strong>on</strong>g>of</str<strong>on</strong>g> Occupati<strong>on</strong> Certificate and <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

maintained in a healthy and vigorous c<strong>on</strong>diti<strong>on</strong> at all times.<br />

1<strong>18</strong>. The Principal Certifying Authority shall ensure that the landscape works, have <str<strong>on</strong>g>be</str<strong>on</strong>g>en installed<br />

correctly, c<strong>on</strong>sistent the approved landscape plan(s), specificati<strong>on</strong> and the c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

c<strong>on</strong>sent prior <str<strong>on</strong>g>to</str<strong>on</strong>g> release <str<strong>on</strong>g>of</str<strong>on</strong>g> the Occupati<strong>on</strong> Certificate.<br />

119. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Occupati<strong>on</strong> Certificate, the Principal Certifying Authority (where not<br />

Council) must provide Ku-ring-gai Council with a signed declarati<strong>on</strong> that the following works<br />

in the road reserve have <str<strong>on</strong>g>be</str<strong>on</strong>g>en completed in full:<br />

- New c<strong>on</strong>crete driveway crossing in accordance with levels and specificati<strong>on</strong>s issued by<br />

Council.<br />

- Removal <str<strong>on</strong>g>of</str<strong>on</strong>g> all redundant driveway crossings and kerb laybacks (or secti<strong>on</strong>s there<str<strong>on</strong>g>of</str<strong>on</strong>g>)<br />

and reinstatement <str<strong>on</strong>g>of</str<strong>on</strong>g> these areas <str<strong>on</strong>g>to</str<strong>on</strong>g> footpath, turfed verge and upright kerb and gutter.<br />

(Reinstatement works <str<strong>on</strong>g>to</str<strong>on</strong>g> match surrounding adjacent infrastructure with respect <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

integrati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> levels and materials).<br />

- Full repair and resealing <str<strong>on</strong>g>of</str<strong>on</strong>g> any road surface damaged during c<strong>on</strong>structi<strong>on</strong>.<br />

- Full replacement <str<strong>on</strong>g>of</str<strong>on</strong>g> damaged secti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> grass verge with a n<strong>on</strong>-friable turf <str<strong>on</strong>g>of</str<strong>on</strong>g> native<br />

variety <str<strong>on</strong>g>to</str<strong>on</strong>g> match existing.<br />

N:\0607<strong>18</strong>-OMC-PR-03482-15 TO 19 TURRAMURRA AVENU.doc/murphy/62