23.03.2014 Views

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>18</strong> July <strong>2006</strong> 2 / 21<br />

2 Princes Street, Turramurra<br />

Item 2<br />

DA0190/06<br />

<strong>18</strong> July <strong>2006</strong><br />

Certifying Authority, prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the issue <str<strong>on</strong>g>of</str<strong>on</strong>g> any Occupati<strong>on</strong> Certificate, that the installati<strong>on</strong> and<br />

performance <str<strong>on</strong>g>of</str<strong>on</strong>g> the above equipment and acoustic treatment, when in operati<strong>on</strong>, complies<br />

with:<br />

The Building Code <str<strong>on</strong>g>of</str<strong>on</strong>g> Australia; and<br />

Australian Standard AS1668 and other relevant codes.<br />

The report prepared by Acoustic Logic C<strong>on</strong>sultancy, dated 28 April <strong>2006</strong> and num<str<strong>on</strong>g>be</str<strong>on</strong>g>red<br />

<strong>2006</strong>275/1304A/R1/GW<br />

38. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the release <str<strong>on</strong>g>of</str<strong>on</strong>g> any occupati<strong>on</strong> certificate, a compliance certificate must <str<strong>on</strong>g>be</str<strong>on</strong>g> obtained<br />

from an accredited certifier, certifying that the building works for the building <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> occupied<br />

comply with the plans and specificati<strong>on</strong>s approved by this development c<strong>on</strong>sent; and any<br />

c<strong>on</strong>structi<strong>on</strong> certificate associated with this c<strong>on</strong>sent for the buildings <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> occupied. If the<br />

PCA is not the Council, then this compliance certificate must <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Council at<br />

the same time as the occupati<strong>on</strong> certificate is submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Council in accordance with<br />

Clause 151(2) <str<strong>on</strong>g>of</str<strong>on</strong>g> the E P & A Act regulati<strong>on</strong>s.<br />

39. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> occupati<strong>on</strong>, issue <str<strong>on</strong>g>of</str<strong>on</strong>g> an Occupati<strong>on</strong> Certificate or issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Final Compliance<br />

Certificate, any damaged public infrastructure caused as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> works <strong>on</strong> the<br />

subject site (including damage caused by, but not limited <str<strong>on</strong>g>to</str<strong>on</strong>g>, delivery vehicles, waste<br />

collecti<strong>on</strong>, c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs, sub c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs, c<strong>on</strong>crete vehicles) must <str<strong>on</strong>g>be</str<strong>on</strong>g> fully repaired <str<strong>on</strong>g>to</str<strong>on</strong>g> the<br />

satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Council Engineers at no cost <str<strong>on</strong>g>to</str<strong>on</strong>g> Council.<br />

40. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Occupati<strong>on</strong> Certificate, the Principal Certifying Authority (where not<br />

Council) must provide Ku-ring-gai Council with a signed declarati<strong>on</strong> that the following works<br />

in the road reserve have <str<strong>on</strong>g>be</str<strong>on</strong>g>en completed in full:<br />

• New c<strong>on</strong>crete driveway crossing in accordance with levels and specificati<strong>on</strong>s issued by<br />

Council.<br />

• Removal <str<strong>on</strong>g>of</str<strong>on</strong>g> all redundant driveway crossings and kerb laybacks (or secti<strong>on</strong>s there<str<strong>on</strong>g>of</str<strong>on</strong>g>)<br />

and reinstatement <str<strong>on</strong>g>of</str<strong>on</strong>g> these areas <str<strong>on</strong>g>to</str<strong>on</strong>g> footpath, turfed verge and upright kerb and gutter.<br />

(Reinstatement works <str<strong>on</strong>g>to</str<strong>on</strong>g> match surrounding adjacent infrastructure with respect <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

integrati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> levels and materials).<br />

• Full repair and resealing <str<strong>on</strong>g>of</str<strong>on</strong>g> any road surface damaged during c<strong>on</strong>structi<strong>on</strong>.<br />

• Full replacement <str<strong>on</strong>g>of</str<strong>on</strong>g> damaged secti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> grass verge with a n<strong>on</strong>-friable turf <str<strong>on</strong>g>of</str<strong>on</strong>g> native<br />

variety <str<strong>on</strong>g>to</str<strong>on</strong>g> match existing.<br />

• All works must <str<strong>on</strong>g>be</str<strong>on</strong>g> completed in accordance with the General Specificati<strong>on</strong> for the<br />

C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Road and Drainage Works in Ku-ring-gai Council, dated Novem<str<strong>on</strong>g>be</str<strong>on</strong>g>r<br />

2004. The Occupati<strong>on</strong> Certificate must not <str<strong>on</strong>g>be</str<strong>on</strong>g> issued until all damaged public<br />

infrastructure caused as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> works <strong>on</strong> the subject site (including<br />

damage caused by, but not limited <str<strong>on</strong>g>to</str<strong>on</strong>g>, delivery vehicles, waste collecti<strong>on</strong>, c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs,<br />

sub c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs, c<strong>on</strong>crete vehicles) is fully repaired <str<strong>on</strong>g>to</str<strong>on</strong>g> the satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Council. Repair<br />

works shall <str<strong>on</strong>g>be</str<strong>on</strong>g> at no cost <str<strong>on</strong>g>to</str<strong>on</strong>g> Council.<br />

41. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Occupati<strong>on</strong> Certificate the applicant must create a Positive Covenant and<br />

Restricti<strong>on</strong> <strong>on</strong> the Use <str<strong>on</strong>g>of</str<strong>on</strong>g> Land under Secti<strong>on</strong> 88 E <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>veyancing Act 1919, burdening<br />

N:\0607<strong>18</strong>-OMC-PR-03466-2 PRINCES STREET TURRAMUR.doc/nrichter/21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!