23.03.2014 Views

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>18</strong> July <strong>2006</strong> 3 / 45<br />

15 TO 19 TURRAMURRA AVENUE AND 1 TO<br />

1A WONGA WONGA STREET, TURRAMURRA<br />

Item 3<br />

DA0068/06<br />

7 July <strong>2006</strong><br />

secti<strong>on</strong>s 5.3 and 5.4 <str<strong>on</strong>g>of</str<strong>on</strong>g> Councils Water Management Development C<strong>on</strong>trol Plan 47, available<br />

in hard copy at Council and <strong>on</strong> the Council website.<br />

56. A manda<str<strong>on</strong>g>to</str<strong>on</strong>g>ry rainwater retenti<strong>on</strong> and re-use system comprising s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage tanks and ancillary<br />

plumbing must <str<strong>on</strong>g>be</str<strong>on</strong>g> provided for the development. The (minimum) <str<strong>on</strong>g>to</str<strong>on</strong>g>tal s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage volume <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

rainwater tank system, and the prescri<str<strong>on</strong>g>be</str<strong>on</strong>g>d re-use <str<strong>on</strong>g>of</str<strong>on</strong>g> the water <strong>on</strong> site, must satisfy all relevant<br />

BASIX commitments and the requirements specified in chapter 6 <str<strong>on</strong>g>of</str<strong>on</strong>g> Ku-ring-gai Council<br />

Water Management Development C<strong>on</strong>trol Plan 47 (DCP47).<br />

57. In additi<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> the manda<str<strong>on</strong>g>to</str<strong>on</strong>g>ry rainwater retenti<strong>on</strong> and re-use system provided, an <strong>on</strong>-site<br />

s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmwater detenti<strong>on</strong> system must <str<strong>on</strong>g>be</str<strong>on</strong>g> provided for the development <str<strong>on</strong>g>to</str<strong>on</strong>g> c<strong>on</strong>trol the rate <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

run<str<strong>on</strong>g>of</str<strong>on</strong>g>f leaving the site. The minimum volume <str<strong>on</strong>g>of</str<strong>on</strong>g> the required <strong>on</strong>-site detenti<strong>on</strong> system must <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

determined in accordance with chapter 6 <str<strong>on</strong>g>of</str<strong>on</strong>g> the Ku-ring-gai Council Water Management<br />

Development C<strong>on</strong>trol Plan 47 (DCP 47) - having regard <str<strong>on</strong>g>to</str<strong>on</strong>g> the specified volume c<strong>on</strong>cessi<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g>fered in lieu <str<strong>on</strong>g>of</str<strong>on</strong>g> installing rainwater retenti<strong>on</strong> tanks. The design <str<strong>on</strong>g>of</str<strong>on</strong>g> the <strong>on</strong>-site detenti<strong>on</strong><br />

system must <str<strong>on</strong>g>be</str<strong>on</strong>g> performed by a qualified civil/hydraulic engineer and must satisfy the design<br />

c<strong>on</strong>trols set out in appendix 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> DCP 47.<br />

58. For s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmwater c<strong>on</strong>trol a 200mm wide grated channel/trench drain with a heavy-duty<br />

removable galvanized grate is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> provided in fr<strong>on</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> the garage door/basement parking slab<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> collect driveway run<str<strong>on</strong>g>of</str<strong>on</strong>g>f. The channel drain shall <str<strong>on</strong>g>be</str<strong>on</strong>g> c<strong>on</strong>nected <str<strong>on</strong>g>to</str<strong>on</strong>g> the main drainage system<br />

and must have an outlet <str<strong>on</strong>g>of</str<strong>on</strong>g> minimum diameter 150mm <str<strong>on</strong>g>to</str<strong>on</strong>g> prevent blockage by silt and debris.<br />

59. To c<strong>on</strong>trol surface run<str<strong>on</strong>g>of</str<strong>on</strong>g>f all new exposed impervious areas graded <str<strong>on</strong>g>to</str<strong>on</strong>g>wards adjacent property<br />

and/or habitable areas are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> drained via the main drainage system. This may require the<br />

installati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> suitable inlets pits, cut-<str<strong>on</strong>g>of</str<strong>on</strong>g>f structures (e.g. kerb), and/or barriers that direct such<br />

run<str<strong>on</strong>g>of</str<strong>on</strong>g>f <str<strong>on</strong>g>to</str<strong>on</strong>g> the formal drainage system. Details for such measures shall <str<strong>on</strong>g>be</str<strong>on</strong>g> shown <strong>on</strong> the<br />

approved C<strong>on</strong>structi<strong>on</strong> Certificate issue drawings, <str<strong>on</strong>g>to</str<strong>on</strong>g> the satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Principal<br />

Certifying Authority.<br />

60. During c<strong>on</strong>structi<strong>on</strong>, s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmwater run<str<strong>on</strong>g>of</str<strong>on</strong>g>f must <str<strong>on</strong>g>be</str<strong>on</strong>g> disposed in a c<strong>on</strong>trolled manner that is<br />

compatible with the erosi<strong>on</strong> and sediment c<strong>on</strong>trols <strong>on</strong> the site. Immediately up<strong>on</strong> completi<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> any impervious areas <strong>on</strong> the site (incl uding ro<str<strong>on</strong>g>of</str<strong>on</strong>g>s, driveways, paving) and where the final<br />

drainage system is incomplete, the necessary temporary drainage systems must <str<strong>on</strong>g>be</str<strong>on</strong>g> installed <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

manage and c<strong>on</strong>trol run<str<strong>on</strong>g>of</str<strong>on</strong>g>f as far as the approved point <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmwater discharge. Such<br />

measures shall <str<strong>on</strong>g>be</str<strong>on</strong>g> <str<strong>on</strong>g>to</str<strong>on</strong>g> the satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Principal Certifying Authority.<br />

61. It is the Applicants and c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs full resp<strong>on</strong>sibility <str<strong>on</strong>g>to</str<strong>on</strong>g> ascertain the exact locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

Council drainage pipe traversing the site and take measures <str<strong>on</strong>g>to</str<strong>on</strong>g> protect it. All proposed<br />

structures are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> sited fully clear <str<strong>on</strong>g>of</str<strong>on</strong>g> any Council drainage pipes, drainage easements,<br />

watercourses and trunk overland flow paths <strong>on</strong> the site. Trunk or dedicated flow paths shall<br />

not <str<strong>on</strong>g>be</str<strong>on</strong>g> impeded or diverted by fill or structures unless otherwise approved. In the event <str<strong>on</strong>g>of</str<strong>on</strong>g> a<br />

pipeline <str<strong>on</strong>g>be</str<strong>on</strong>g>ing uncovered during c<strong>on</strong>structi<strong>on</strong>, all work is <str<strong>on</strong>g>to</str<strong>on</strong>g> cease and the Principal Certifying<br />

Authority and Council must <str<strong>on</strong>g>be</str<strong>on</strong>g> c<strong>on</strong>tacted immediately for advice. Any damage caused <str<strong>on</strong>g>to</str<strong>on</strong>g> the<br />

Council pipe shall <str<strong>on</strong>g>be</str<strong>on</strong>g> immediately repaired in full and at no cost <str<strong>on</strong>g>to</str<strong>on</strong>g> Council.<br />

62. No part <str<strong>on</strong>g>of</str<strong>on</strong>g> the building (including overhangs and footings) shall encroach over any easement<br />

and no loadings shall <str<strong>on</strong>g>be</str<strong>on</strong>g> imposed <str<strong>on</strong>g>to</str<strong>on</strong>g> the utilities within any easement.<br />

N:\0607<strong>18</strong>-OMC-PR-03482-15 TO 19 TURRAMURRA AVENU.doc/murphy/45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!