Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>18</strong> July <strong>2006</strong> 3 / 46<br />

15 TO 19 TURRAMURRA AVENUE AND 1 TO<br />

1A WONGA WONGA STREET, TURRAMURRA<br />

Item 3<br />

DA0068/06<br />

7 July <strong>2006</strong><br />

63. To ensure structural stability, footings <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> located adjacent <str<strong>on</strong>g>to</str<strong>on</strong>g> easements and/or Council<br />

drainage pipes shall <str<strong>on</strong>g>be</str<strong>on</strong>g> sited and c<strong>on</strong>structed so that all footings are located outside <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

easement boundaries. The applicant shall refer <str<strong>on</strong>g>to</str<strong>on</strong>g> Council Plan 80-011 c<strong>on</strong>cerning such works.<br />

Footings must extend <str<strong>on</strong>g>to</str<strong>on</strong>g> at least the depth <str<strong>on</strong>g>of</str<strong>on</strong>g> the invert <str<strong>on</strong>g>of</str<strong>on</strong>g> the adjacent pipe within the<br />

easement unless the footings are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> placed <strong>on</strong> competent <str<strong>on</strong>g>be</str<strong>on</strong>g>drock. If permanent excavati<strong>on</strong><br />

is proposed <str<strong>on</strong>g>be</str<strong>on</strong>g>neath the obvert <str<strong>on</strong>g>of</str<strong>on</strong>g> the pipe within the easement, suitable means <str<strong>on</strong>g>to</str<strong>on</strong>g> protect the<br />

excavati<strong>on</strong> from seepage or other water flow from the pipe and trench, and means <str<strong>on</strong>g>to</str<strong>on</strong>g> retain the<br />

easement and associated pipe cover, are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> provided by the applicant at no cost <str<strong>on</strong>g>to</str<strong>on</strong>g> Council.<br />

Council accepts no liability for such seepage or water flows now or at any time in the future<br />

resulting from such excavati<strong>on</strong>.<br />

64. A maintenance period <str<strong>on</strong>g>of</str<strong>on</strong>g> six (6) m<strong>on</strong>ths applies <str<strong>on</strong>g>to</str<strong>on</strong>g> all work in the public road reserve carried<br />

out by the applicant - after the works have <str<strong>on</strong>g>be</str<strong>on</strong>g>en completed <str<strong>on</strong>g>to</str<strong>on</strong>g> the satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Ku-ring-gai<br />

Council. In that maintenance period, the applicant shall <str<strong>on</strong>g>be</str<strong>on</strong>g> liable for any secti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

completed public infrastructure work which fails <str<strong>on</strong>g>to</str<strong>on</strong>g> perform in the designed manner, or as<br />

would reas<strong>on</strong>ably <str<strong>on</strong>g>be</str<strong>on</strong>g> expected under the operating c<strong>on</strong>diti<strong>on</strong>s. The maintenance period shall<br />

commence <strong>on</strong>ce the Applicant receives a written indicati<strong>on</strong> from Council stating that the<br />

works involving public infrastructure have <str<strong>on</strong>g>be</str<strong>on</strong>g>en completed satisfac<str<strong>on</strong>g>to</str<strong>on</strong>g>rily.<br />

65. Where required, the adjustment or inclusi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any new utility service facilities must <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

carried out by the applicant and in accordance with the requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> the relevant utility<br />

authority. These works shall <str<strong>on</strong>g>be</str<strong>on</strong>g> at no cost <str<strong>on</strong>g>to</str<strong>on</strong>g> Council. It is the Applicants full resp<strong>on</strong>sibility <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

make c<strong>on</strong>tact with the relevant utility authorities <str<strong>on</strong>g>to</str<strong>on</strong>g> ascertain the impacts <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposal up<strong>on</strong><br />

utility services at the appropriate stage <str<strong>on</strong>g>of</str<strong>on</strong>g> the development (including water, ph<strong>on</strong>e, gas and<br />

the like). Council accepts no resp<strong>on</strong>sibility whatsoever for any matter arising from its approval<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> this applicati<strong>on</strong> involving any influence up<strong>on</strong> utility services provided by another authority.<br />

66. The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> temporary sediment and erosi<strong>on</strong> c<strong>on</strong>trol facilities and measures must <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

installed, prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> the site <str<strong>on</strong>g>to</str<strong>on</strong>g> eliminate unnecessary<br />

erosi<strong>on</strong> and loss <str<strong>on</strong>g>of</str<strong>on</strong>g> sediment. These facilities must <str<strong>on</strong>g>be</str<strong>on</strong>g> maintained in working order during<br />

c<strong>on</strong>structi<strong>on</strong> works up <str<strong>on</strong>g>to</str<strong>on</strong>g> completi<strong>on</strong>. All sediment traps must <str<strong>on</strong>g>be</str<strong>on</strong>g> cleared <strong>on</strong> a regular basis and<br />

after each major s<str<strong>on</strong>g>to</str<strong>on</strong>g>rm, and/or as directed by the Principal Certifying Authority and Council<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g>ficers.<br />

67. Driveways and vehicular access ramps must <str<strong>on</strong>g>be</str<strong>on</strong>g> designed not <str<strong>on</strong>g>to</str<strong>on</strong>g> scrape the underside <str<strong>on</strong>g>of</str<strong>on</strong>g> cars. In<br />

all respects, the proposed vehicle access and accommodati<strong>on</strong> arrangements must <str<strong>on</strong>g>be</str<strong>on</strong>g> designed<br />

and c<strong>on</strong>structed <str<strong>on</strong>g>to</str<strong>on</strong>g> comply with the minimum requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> Australian Standard 2890.1<br />

(2004) “Off-Street car parking”.<br />

68. The Applicant must obtain a Secti<strong>on</strong> 73 Compliance Certificate under the Sydney Water Act<br />

1994. An applicati<strong>on</strong> must <str<strong>on</strong>g>be</str<strong>on</strong>g> made through an authorised Water Servicing Coordina<str<strong>on</strong>g>to</str<strong>on</strong>g>r. The<br />

Applicant is <str<strong>on</strong>g>to</str<strong>on</strong>g> refer <str<strong>on</strong>g>to</str<strong>on</strong>g> “Your Business” secti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Sydney Water’s web site at<br />

www.sydneywater.com.au then the “e-developer” ic<strong>on</strong> or teleph<strong>on</strong>e 13 20 92. Following<br />

applicati<strong>on</strong> a “Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Requirements” will detail water and sewer extensi<strong>on</strong>s <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> built and<br />

charges <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> paid. Please make early c<strong>on</strong>tact with the Coordina<str<strong>on</strong>g>to</str<strong>on</strong>g>r, since building <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

water/sewer extensi<strong>on</strong>s can <str<strong>on</strong>g>be</str<strong>on</strong>g> time c<strong>on</strong>suming and may impact <strong>on</strong> other services and building,<br />

driveway or landscape design.<br />

N:\0607<strong>18</strong>-OMC-PR-03482-15 TO 19 TURRAMURRA AVENU.doc/murphy/46